HU Qi, SHI Jian, HUANG Tian-ming, FANG Hua-jian, LI Jian-ping, CHEN Yun, ZHANG Kai. Experimental study on prestressed assembly steel strut system in foundation excavations[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(S1): 93-96. DOI: 10.11779/CJGE2019S1024
Citation: HU Qi, SHI Jian, HUANG Tian-ming, FANG Hua-jian, LI Jian-ping, CHEN Yun, ZHANG Kai. Experimental study on prestressed assembly steel strut system in foundation excavations[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(S1): 93-96. DOI: 10.11779/CJGE2019S1024

Experimental study on prestressed assembly steel strut system in foundation excavations

More Information
  • Received Date: April 28, 2019
  • Published Date: July 14, 2019
  • The prestressed assemble steel support system (PASS) is an innovative steel support which can be recycled and prestressed and has a lot of advantages, such as high-strength connection and high reliability, so it has been used more and more in China. To solve some problems urgently, a series of PASS pressure and observation experiments are carried out in a project with large span and poor soil in the west of Hangzhou. The experiment shows that the measured stiffness of PASS is slightly less than that in theory, and the critical factor for deformation of the foundation pit is the supporting prestress. The carrying capacity of PASS depends on the stability of support, so it should meet the design requirements and has a lertain redundancy. The maximum stress of PASS varing with temperature is about 29.1% of the actual axial force or 7.4% of the design axial force, and the influences of temperature stress are controllable.
  • [1]
    张旷成, 李继民. 杭州地铁湘湖站“08.11.15”基坑坍塌事故分析[J]. 岩土工程学报, 2010, 32(增刊1): 338-342.
    (ZHANG Kuang-cheng, LI Ji-min.Accident analysis for ‘08.11.15’ foundation pit collapse of Xianghu Station of Hangzhou metro[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(S1): 338-342. (in Chinese))
    [2]
    COI(2005). Report of the Committee of Inquiry into the incident at the MRT circle line worksite that led to collapse of Nicoll Highway on 20 April 2004[R]. Singapore City: Ministry of Manpower.
    [3]
    程雪松, 郑刚, 邓楚涵, 等. 基坑悬臂排桩支护局部失效引发连续破坏机理研究[J]. 岩土工程学报, 2015, 37(7): 1249-1263.
    (CHENG Xue-song, ZHENG Gang, DENG Chu-han, et al.Study of the mechanism of progressive collapse induced by partial failure of cantilever contiguous retaining piles[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(7): 1249-1263. (in Chinese))
    [4]
    李瑛, 陈东, 刘兴旺, 等. 预应力型钢组合支撑应用于软土基坑支护[J]. 岩土工程学报, 2014, 36(增刊1): 51-55.
    (LI Ying, CHEN Dong, LIU Xingwang, et al.Application of prestressed assemble steel support system in retaining structures for foundation pits in soft soils[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(S1): 51-55. (in Chinese))
    [5]
    DB33T1142—2017基坑工程装配式型钢组合支撑应用技术规程[S]. 2017. (DB33T1142—2017 Technical specification for assembly steel strutssystem in foundation excavation[S]. 2017. (in Chinese))
    [6]
    JGJ 120—2012 建筑基坑支护技术规程[S]. 2012.
    (JGJ 120—2012 Technical specification for retaining and protection of building foundation excavations[S]. 2012. (in Chinese))

Catalog

    Article views (271) PDF downloads (160) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return