HAN Chang-liang, ZHANG Nong, LI Gui-chen, LI Bao-yu, WU Hai. Stability analysis of compound bearing structure of gob-side entry retaining with large mining height[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(5): 969-976. DOI: 10.11779/CJGE201405023
Citation: HAN Chang-liang, ZHANG Nong, LI Gui-chen, LI Bao-yu, WU Hai. Stability analysis of compound bearing structure of gob-side entry retaining with large mining height[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(5): 969-976. DOI: 10.11779/CJGE201405023

Stability analysis of compound bearing structure of gob-side entry retaining with large mining height

More Information
  • Received Date: April 17, 2013
  • Published Date: May 20, 2014
  • The concept of roadside compound structure is proposed through the analysis of roof movement of gob-side entry retaining under large mining height, and the stability mechanism is revealed by mechanical calculation. The results indicate that the roof load is born by a compound bearing structure composed of “roof-wall-floor”. The action relations of staged wall strength and roof movement are distinguished, the initial strength should be larger than the roof load, and the final strength should adapt to the roof deformation, so that the wall strength and roof movement can maintain a dynamic coordination. The roofs impose higher horizontal force on the wall under large mining height, thus the horizontal sliding factor should be less than the friction coefficient on the contact surface of wall and rock to realize self-stabilization. The inboard stress cannot be higher than the strength of roof and floor in order to avoid the strata being cut off, and the outboard stress cannot be higher than the strength of wall in order to avoid the wall being broken. Decreasing the widths of entry and wall can reduce the stress of wall, based on which the determination methods for the widths of entry and backfill body are proposed. A field test with 4.2 m mining height, whose entry and backfill width is designed to be 3 m and 4 m respectively, is conducted to demonstrate the effectiveness of the proposed method. The results verify the reasonableness of the conclusions.
  • [1]
    孙恒虎, 赵炳利. 沿空留巷的理论与实践[M]. 北京: 煤炭工业出版社, 1993. (SUN Heng-hu, ZHAO Bing-li. Theory and practice of gob-side entry retaining[M]. Beijing: China Coal Industry Publishing House, 1993. (in Chinese))
    [2]
    徐金海, 付宝杰, 周保精. 沿空留巷充填体的流变特性分析[J]. 中国矿业大学学报, 2008, 37(5): 585-589. (XU Jin-hai, FU Bao-jie, ZHOU Bao-jing. Back fill rheological properties for gob-side entry retaining[J]. Journal of China University of Mining & Technology, 2008, 37(5): 585-589. (in Chinese))
    [3]
    ZHANG Nong, YUAN Liang, HAN Chang-liang, et al. Stability and deformation of surrounding rock in pillarless gob-side entry retaining[J]. Safety Science, 2012, 50(4): 593-599.
    [4]
    张东升, 缪协兴, 冯光明, 等. 综放沿空留巷充填体稳定性控制[J]. 中国矿业大学学报, 2003, 32(3): 232-235. (ZHANG Dong-sheng, MIAO Xie-xing, FENG Guang-ming, et al. Stability control of packing body for gob-side entry retaining in fully-mechanized coal faces with top-coal caving[J]. Journal of China University of Mining & Technology, 2003, 32(3): 232-235. (in Chinese))
    [5]
    王金安, 韦文兵, 冯锦艳. 综放沿空异形煤柱留巷系统力学场演化规律[J]. 北京科技大学学报, 2006, 28(4): 317-323. (WANG Jin-an, WEI Wen-bing, FENG Jin-yan. Stress evolution of an irregular pillar protected roadway system remained along goaf in fully mechanized top-coal caving mining field[J]. Journal of University of Science and Technology Beijing, 2006, 28(4): 317-323. (in Chinese))
    [6]
    周保精, 徐金海, 倪海敏. 小宽高比充填体沿空留巷稳定性研究[J]. 煤炭学报, 2010, 35(增刊): 33-37. (ZHOU Bao-jing, XU Jin-hai, NI Hai-min. The small aspect ratio backfill gob-side entry retaining stability[J].Journal of China Coal Society, 2010, 35(S0): 33-37. (in Chinese))
    [7]
    弓培林. 大采高采场围岩控制理论及应用研究[M]. 北京:煤炭工业出版社, 2006. (GONG Pei-lin. Surrounding rock control theory and application study of the coal face with greater mining height[M]. Beijing: China Coal Industry Publishing House, 2006. (in Chinese))
    [8]
    胡国伟, 靳钟铭. 大采高综采工作面矿压观测及其显现规律研究[J]. 太原理工大学学报, 2006, 37(2): 127-130. (HU Guo-wei, JIN Zhong-ming. Practice of pressure law and study on the strata behavior regularity of large mining height fully-mechanized face[J]. Journal of Taiyuan University of Technology, 2006, 37(2): 127-130. (in Chinese))
    [9]
    付玉平, 宋选民, 邢平伟, 等. 大采高采场顶板断裂关键块稳定性分析[J]. 煤炭学报, 2009, 34(8): 1027-1031. (FU Yu-ping, SONG Xuan-min, XING Ping-wei, et al. Stability analysis on main roof key block in large mining height workface[J]. Journal of China Coal Society, 2009, 34(8): 1027-1031. (in Chinese))
    [10]
    王学启, 胡仁山, 孙立亚. 大采高沿空留巷巷旁充填试验研究[J]. 矿山压力与顶板管理, 1997, 14(3): 153-155. (WANG Xue-qi, HU Ren-shan, SUN Li-ya. Experimental research on backfill of gob-side entry retaining with large mining height[J]. Ground Pressure and Strata Control, 1997, 14(3): 153-155. (in Chinese))
    [11]
    刘益成, 孙立亚. 大采高工作面沿空留巷巷旁充填支护实践[J]. 煤炭科学技术, 2000, 28(3): 19-20. (LIU Yi-cheng, SUN Li-ya. Test of backfill support in gob-side entry retaining at fully mechanized face with large mining height[J]. Coal Science and Technology, 2000, 28(3): 19-20. (in Chinese))
    [12]
    李增田, 李树军. 大采高工作面下巷沿空留巷实践[J]. 煤炭技术, 2003, 22(1): 30-31. (LI Zeng-tian, LI Shu-jun. Practice of gob-side entry retaining at working face with large mining height[J]. Coal Technology, 2003, 22(1): 30-31. (in Chinese))
    [13]
    韩昌良, 张 农, 钱德雨, 等. 大采高沿空留巷顶板安全控制及跨高比优化分析[J]. 采矿与安全工程学报, 2013, 30(3): 348-354. (HAN Chang-liang, ZHANG Nong, QIAN De-yu, et al. Optimization analysis of span-depth ratio for roof safety control in gob-side entry retaining under large mining height[J]. Journal of Mining & Safety Engineering, 2013, 30(3): 348-354. (in Chinese))
    [14]
    韩昌良, 张 农, 李桂臣, 等. 覆岩分次垮落时留巷顶板离层形成机制[J]. 中国矿业大学学报, 2012, 41(6): 893-899. (HAN Chang-liang, ZHANG Nong, LI Gui-chen, et al. Bed Separation Mechanism under Sequential Roof Collapse Condition in a Gob-side Entry Retaining[J]. Journal of China University of Mining & Technology, 2012, 41(6): 893-899. (in Chinese))
    [15]
    李迎富, 华心祝, 蔡瑞春. 沿空留巷关键块的稳定性力学分析及工程应用[J]. 采矿与安全工程学报, 2012, 29(3): 357-364. (LI Ying-fu, HUA Xin-zhu, CAI Rui-chun. Mechanics analysis on the stability of key block in the gob-side entry retaining and engineering application[J]. Journal of Mining & Safety Engineering, 2012, 29(3): 357-364. (in Chinese))
    [16]
    李学华. 综放沿空掘巷围岩稳定性控制原理与技术[M]. 徐州: 中国矿业大学出版社, 2008. (LI Xue-hua. Control theory and technology of surrounding rock stability for gob-side entry driving in fully mechanized caving mining[M]. Xuzhou: China University of Mining and Technology Press, 2008. (in Chinese))
    [17]
    夏才初, 孙宗颀. 工程岩体节理力学[M]. 上海: 同济大学出版社, 2002. (XIA Cai-chu, SUN Zong-qi. Joint mechanics of engineering rock mass[M]. Shanghai: Tongji University Press, 2002. (in Chinese))

Catalog

    Article views (350) PDF downloads (538) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return