Citation: | ZHANG Dong-mei, PANG Jian, REN Hui, HAN Lei. Observed deformation behavior of Gongbei Tunnel of Hong Kong-Zhuhai-Macao Bridge during construction[J]. Chinese Journal of Geotechnical Engineering, 2020, 42(9): 1632-1641. DOI: 10.11779/CJGE202009007 |
[1] |
黄俊, 张顶立. 地铁暗挖隧道上覆地层大变形规律分析[J]. 岩土力学, 2004(8): 1288-1292, 1301. doi: 10.3969/j.issn.1000-7598.2004.08.024
HUANG Jun, ZHANG Ding-li. Analysis of large deformation regularity in stratum above metro tunnel[J]. Rock & Soil Mechanics, 2004(8): 1288-1292, 1301. (in Chinese) doi: 10.3969/j.issn.1000-7598.2004.08.024
|
[2] |
VAHEDIFARD F L D, MEEHAN C L. Displacement-based internal design of geosynthetic-reinforced earth structures subjected to seismic loading conditions[J]. Géotechnique, 2013, 63: 451-462. doi: 10.1680/geot.11.P.130
|
[3] |
张成平, 张顶立, 王梦恕, 等. 城市隧道施工诱发的地面塌陷灾变机制及其控制[J]. 岩土力学, 2010, 31(增刊1): 303-309. doi: 10.16285/j.rsm.2010.s1.041
ZHANG Cheng-ping, ZHANG Ding-li, WANG Meng-shu, et al. Catastrophe mechanism and control technology of ground collapse induced by urban tunneling[J]. Rock & Soil Mechanics, 2010, 31(S1): 303-309. (in Chinese) doi: 10.16285/j.rsm.2010.s1.041
|
[4] |
MUSSO G. Jacked pipe provides roof for underground construction in busy urban area[J]. Civil Engineering, 1979, 49(11): 79-82.
|
[5] |
陈湘生. 冻结法几个关键问题及在地下空间近接工程中最新应用[J]. 隧道建设, 2015, 35(12): 1243-1251. doi: 10.3973/j.issn.1672-741X.2015.12.002
CHEN Xiang-sheng. Several key points of artificial ground freezing method and its latest application in China[J]. Tunnel Construction, 2015, 35(12): 1243-1251. (in Chinese) doi: 10.3973/j.issn.1672-741X.2015.12.002
|
[6] |
LIU J G, MA B S, CHENG Y. Design of the Gongbei tunnel using a very large cross-section pipe-roof and soil freezing method[J]. Tunnelling & Underground Space Technology, 2018, 72: 28-40.
|
[7] |
ZHANG P, MA B S, ZENG C, et al. Key techniques for the largest curved pipe jacking roof to date: a case study of Gongbei tunnel[J]. Tunnelling & Underground Space Technology, 2016, 59: 134-145.
|
[8] |
陶德敬, 王明年, 刘大刚. 冻结法隧道施工引起的地表移动及变形预测[J]. 现代隧道技术, 2006, 43(6): 45-50. doi: 10.3969/j.issn.1009-6582.2006.06.009
TAO De-jing, WANG Ming-nian, LIU Da-gang. Prediction of surface movement and deformation caused by the freezing method construction of tunnels[J]. Modern Tunnelling Technology, 2006, 43(6): 45-50. (in Chinese) doi: 10.3969/j.issn.1009-6582.2006.06.009
|
[9] |
肖世国, 夏才初, 朱合华, 等. 管幕内箱涵顶进中顶部管幕竖向变形预测[J]. 岩石力学与工程学报, 2006, 25(9): 1887-1892. doi: 10.3321/j.issn:1000-6915.2006.09.023
XIAO Shi-guo, XIA Cai-chu, ZHU He-hua, et al. Vertical deformation prediction on upper pipe-roof during a box culvert being pushed within a pipe-roof[J]. Chinese Journal of Rock Mechanics & Engineering, 2006, 25(9): 1887-1892. (in Chinese) doi: 10.3321/j.issn:1000-6915.2006.09.023
|
[10] |
朱合华, 闫治国, 李向阳, 等. 饱和软土地层中管幕法隧道施工风险分析[J]. 岩石力学与工程学报, 2005, 24(增刊2): 5549-5554. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2005S2050.htm
ZHU He-hua, YAN Zhi-guo, LI Xiang-yang, et al. Analysis of construction risks for pipe-roofing tunnel in saturated soft soil[J]. Chinese Journal of Rock Mechanics & Engineering, 2005, 24(S2): 5549-5554. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2005S2050.htm
|
[11] |
胡向东, 邓声君, 汪洋. 拱北隧道“钢管–冻土”复合结构承载力试验研究[J]. 岩土工程学报, 2018, 40(8): 1481-1490. https://www.cnki.com.cn/Article/CJFDTOTAL-YTGC201808017.htm
HU Xiang-dong, DENG Sheng-jun, WANG Yang. Mechanical tests on bearing capacity of steel pipe-frozen soil composite structure applied in Gongbei Tunnel[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(8): 1481-1490. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YTGC201808017.htm
|
[12] |
任辉, 胡向东, 洪泽群, 等. 超浅埋暗挖隧道管幕冻结法积极冻结方案试验研究[J]. 岩土工程学报, 2019, 41(2): 131-139. https://www.cnki.com.cn/Article/CJFDTOTAL-YTGC201902011.htm
REN Hui, HU Xiang-dong, HONG Ze-qun, et al. Experimental study on active freezing scheme of freeze-sealing pipe roof used in ultra-shallow buried tunnels[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(2): 131-139. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YTGC201902011.htm
|
[13] |
胡向东, 李忻轶, 吴元昊, 等. 拱北隧道管幕冻结法管间冻结封水效果实测研究[J]. 岩土工程学报, 2019, 41(12): 2207-2214. https://www.cnki.com.cn/Article/CJFDTOTAL-YTGC201912008.htm
HU Xiang-dong, LI Xin-yi, WU Yuan-hao, et al. Effect of water-proofing in Gongbei Tunnel by freeze-sealing pipe roof method with field temperature data[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(12): 2207-2214. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YTGC201912008.htm
|
[14] |
熊昊翔, 任辉, 翁远林. 拱北隧道5台阶14部开挖施工组织方案分析[J]. 隧道建设, 2019, 39(2): 281-286. https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD201902024.htm
XIONG Hao-xiang, REN Hui, WENG Yuan-lin. Analysis of construction organization scheme of five-bench fourteenstep excavation applied to Gongbei Tunnel[J]. Tunnel Construction, 2019, 39(2): 281-286. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD201902024.htm
|