Mechanical behaviors and supporting effect evaluation of pipe roof in tunneling engineering considering micro-arch effects
-
摘要: 考虑管间微拱效应、初期支护滞后效应、应力释放时空效应和基床系数变化特性,将管棚在轴向上划分为不同受力区段,建立深浅埋隧道管棚的力学理论模型,进而通过参数分析揭示管棚力学响应受影响规律。研究表明:①管棚在环向上表现为微拱效应,具有承载减跨效果,管棚外载为管间微拱转移的岩土压力;②管棚轴向上体现为长梁效应,发挥荷载传递作用,将超前围岩荷载传递至后方初支;③基于Pasternak弹塑性地基梁理论,推导了管棚挠度和内力的理论解,较既有理论解更贴近实测结果;④提出了围岩/初期支护承载比和管棚挠曲变形以量化评价管棚支护效果,为合理控制管棚变形并有效传递围岩荷载,软岩大跨隧道开挖进尺不得大于2 m,拱顶附近30°范围内的管间距较其他部位应缩短5~10 cm。Abstract: Considering the micro-arch effects between the adjacent pipes, the delay effects of the initial support, the spatio-temporal effects of stress release of the surrounding rock and the coefficient change of subgrade reaction, the pipe roof is longitudinally divided into different sections. The corresponding mechanical model for the pipe roof is established both in the deep- and shallow-buried tunnels. Then, the mechanical response laws of the pipe roof are revealed through the parameter analysis. It is found that: (1) In the transverse direction, the pipe roof shows the micro-arch effects to bear the loads. The external loads on the pipe roof are the rock pressures transferred by the micro arches. (2) In the longitudinal direction, the pipe roof shows the beam effects to transfer the loads from the forward rock to the initial support. (3) Based on the Pasternak theory of elastic-plastic foundation beam, the analytical solutions for the deflection and the internal force of pipe roofs are derived, and the proposed theoretical solutions are more accurate than the existing theoretical ones. (4) The bearing ratio of the surrounding rock to the primary support and the pipe deflection are proposed to evaluate the supporting effects of the pipe proof quantitatively. To reliably control the deformation of the pipe roof and effectively transfer the loads of the surrounding rock, the excavation length of large-span tunnel should be limited in 2 m, and the distance between pipe roofs within 30° near the tunnel vault should be 5~10 cm shorter compared with that of other parts.
-
Keywords:
- pipe roof /
- tunneling engineering /
- micro-arch effect /
- mechanical behavior /
- deformation prediction
-
0. 引言
高速铁路以其速度快、运输能力大、舒适方便等优点成为我国大力发展的交通基础设施。随着高铁网络迅速扩张以及运营速度的不断提高,列车运行引起的沿线地面环境振动问题也逐渐成为人们关注的焦点[1-2]。近年来,许多学者针对轨道交通地面环境振动开展了大量的理论、数值和现场实测研究[2]。
本文基于巴黎—布鲁塞尔高铁某路堑段地面环境振动现场实测,分析路堑段地面振动特性和传播衰减规律。在此基础上,推导并建立高铁荷载下路堑段2.5维有限元动力计算模型,对比分析路堑深度和路堑边坡坡度对地面环境振动特性的影响。
1. 高铁路堑段地面振动实测
1.1 测试概况
路堑测试段取自巴黎—布鲁塞尔高速铁路[3-4],位于比利时Braffe小镇西北侧,如图 1。线路为有砟轨道,采用UIC 60型钢轨和预应力轨枕,道床由0.3 m厚道砟层和0.2 m厚底砟层组成。测试采用SM-6型振动检波仪,灵敏度28.8 V/m/s,采样频率1000.0 Hz(图 2)。
如图 3所示,在路堑测试段距轨道9.0~35.0 m范围内依次布置8个测点,监测并记录高速列车通过路堑测试段时引起的地面环境振动。测试段路堑深度为7.2 m,路堑边坡坡度为25.0°。路堑测试段的地基土层分布与物理力学参数如表 1所示。
表 1 路堑测试段土层参数Table 1. Mechanics parameters for cutting土层 厚度/m 弹性模量E/MPa 泊松比μ 阻尼比ξ 密度ρ/(kg·m-3) 剪切波速VS/(m·s-1) 道砟层 0.30 150.00 0.30 0.030 1700.0 184.21 底砟层 0.20 250.00 0.30 0.030 1900.0 224.96 ①1粉土 1.35 108.95 0.33 0.077 1600.0 160.00 ①2粉土 1.35 124.45 0.33 0.070 1600.0 171.00 ②1砂土 3.10 256.60 0.29 0.031 2000.0 223.00 ②2砂土 3.10 348.82 0.29 0.050 2000.0 260.00 注:表中土层厚度从道床底面算起,道床底面以上7.2 m厚的土层同①1。 列车荷载由TGV高速列车提供,列车由两端各一节动力车厢和中间6节客运车厢组成,其几何尺寸、物理参数分别如图 4和表 2所示。实测时,TGV列车以294.7 km/h的速度通过路堑测试段。
表 2 TGV高速列车参数Table 2. Parameters of TGV high-speed train项目 头(尾)车 中间车 车身质量/kg 55790.00 24000.00 转向架质量/kg 2380.00 3040.00 轮对质量/kg 2048.00 2003.00 一级悬挂刚度/(MN·m-1) 2.45 1.40 一级悬挂阻尼/(kN·s·m-1) 20.00 120.00 二级悬挂刚度/(MN·m-1) 2.45 0.45 二级悬挂阻尼/(kN·s·m-1) 40.00 40.00 1.2 路堑测试段地面振动时频特性
路堑测试段与轨道不同间距处的地面竖向振动加速度时程曲线如图 5所示。由图可知,距轨道较近处,可从时程曲线中清晰地分辨出由列车轮对引起的一系列周期性分布的振动加速度峰值。距路堑段轨道9.0 m处,头(尾)车引起的地面振动幅值略大于中间车,这主要是由于头(尾)车质量大于中间车所致(表 2)。随测点与轨道间距增加,列车运行引起的地面振动幅值逐渐减小,测点与轨道距离≥19.0 m后,列车轮对的周期性激励作用逐渐模糊。此外,距轨道较远处,中间车引起的地面振动幅值略大于头(尾)车,这主要是由中间车相邻转向架轮对引起的振动叠加效应所致。
利用Fourier变换对地面振动时程进行处理,得到竖向振动加速度频谱图(图 6)。从图中可知,近轨道处的地面振动频率成分较为丰富,且以20.0~90.0 Hz频段为主。随测点与轨道距离增加,地面振动的中高频成分迅速衰减,而40.0 Hz以下频段的振动衰减速度较慢,测点与轨道距离≥35.0 m后路堑段地面振动主要集中在20.0~40.0 Hz之间。此外,高铁荷载下路堑段地面振动1阶主频随与轨道距离的增加基本维持在26.8 Hz左右,接近列车以294.7 km/h运行条件下的荷载基频(f1=c/L1=27.3 Hz,图 4,L1=3.0 m)[5]。
1.3 路堑测试段地面振动衰减特性
高铁荷载下路堑测试段地面竖向振动加速度峰值随测点与轨道距离增加的衰减曲线如图 7所示。从图 7分析可知,高铁荷载下路堑段地面环境振动随测点与轨道距离增加的衰减过程大致可分为3个阶段。阶段Ⅰ:距轨道9.0~15.0 m范围内,路堑段地面竖向振动加速度峰值迅速衰减,距轨道15.0 m处的地面振动峰值相较于距轨道9.0 m处减小了50.2%,称为“快速衰减”阶段。阶段Ⅱ:距轨道15.0~27.0 m范围内,路堑段地面竖向振动加速度峰值的衰减速度略小于距轨道15.0 m范围内,称为“较快衰减”阶段。阶段Ⅲ:地面竖向振动加速度峰值的衰减速率随测点与轨道距离增加进一步减缓,称为“缓慢衰减”阶段。此外,从图 7中可以看出,高铁荷载下路堑测试段地面振动峰值在堑顶处(距轨道19.0 m处)有较为明显的振动放大现象,这主要是由于瑞利波在堑顶处发生绕射所致[6]。
2. 2.5维有限元模型的建立与验证
2.5维有限元法通过在列车运行方向上进行波数展开,并对时间t进行Fourier变换,将3维动力问题转换为频域-波数域内的问题进行求解,再对结果进行Fourier逆变换得到时域-空间域内的解答。图 8为本文建立的路堑段2.5维有限元模型,记x方向为列车运行方向,z方向为竖直方向,y方向为水平面内垂直轨道方向,定义对时间t和坐标x的双重Fourier变换如式(1a)所示,对应的逆变换如式(1b)所示。
˜ˉu(ξx,y,z,ω)=+∞∫−∞+∞∫−∞u(x,y,z,t)eiξxxe−iωtdxdt, (1a) u(x,y,z,t)=14π2+∞∫−∞+∞∫−∞˜ˉu(ξx,y,z,ω)e−iξxxeiωtdξxdω, (1b) 式中:上标“-”和“~”分别用于表示频域和波数域内的量;ω为圆频率;ξx为x方向上的波数。
2.1 轨道模型与列车荷载
既有研究表明[7],是否考虑钢轨下各部分耦合对列车荷载下地面振动计算结果的影响较小,故本文假定轨道结构在列车荷载下发生整体变形,并将其简化为铺设在路基上的Euler梁,轨道梁在频域-波数域内的动力方程如下:
(EIξ4x−mω2)˜ˉur=˜ˉfT(ξx,ω)+˜ˉp(ξx,ω), (2) 式中:EI为轨道结构弯曲刚度;ur为振动位移;m为轨道结构的综合质量;˜ˉfT为轨道与路基间的相互作用力;˜ˉp为列车荷载。
采用连续轴重荷载模拟列车荷载[1],其频域-波数域内的表达式为:
˜ˉP(ξx,ω)=N∑n=12πcδ(ξx−ω−ω0c)χn(ξx), (3) 式中:χn(ξx)=pn[e−iξxn−1∑m=0Lm+e−iξx(n−1∑m=0Lm+a)+e−iξx(n−1∑m=0Lm+a+b)+e−iξx(n−1∑m=0Lm+2a+b)];N为列车车厢数量;pn为列车第n节车厢的单个轮对荷载;Lm(m=1, 2, 3, …)为第m节车厢的长度,L0为第1节车厢第1组轮对至坐标原点的距离;a为单个转向架下2个轮对间的距离;b为同一车厢下2个转向架的间距。
2.2 路堑段2.5维有限元模型
Xia等[8]研究指出,轨道交通荷载引起的土体应变量一般为10-5或更小量级,产生的振动波属于弹性波。因此,本文将地基土体视为黏弹性介质,其本构方程如下:
σij=2μdεij+λdδije, (4) 式中:σij为应力张量;εij=(ui,j+uj,i)/2,为应变张量;δij为Dirac函数;e为体应变;i,j代表空间坐标系x,y和z轴;λd和μd为考虑材料阻尼的Lamé常数,由式(5)算得。
λd=λ(1+2βi);μd=μ(1+2βi)。 (5) 式中:λ=Eν/[(1+ν)(1−2ν)];μ=E/2(1+ν);E为弹性模量;ν为泊松比;β为阻尼比;i为虚数单位。
将本构方程代入动力方程σij,j+Fi=ρ¨ui,得到以位移表示的运动方程:
μdui,jj+(λd+μd)uj,ji=ρ¨ui, (6) 式中,ρ为密度,上标“··”表示对时间的2阶导数。
利用式(1a)对上式进行双重Fourier变换,结合应力边界条件˜σijnj−˜fi=0,基于Galerkin法,并采用8节点等参单元进行离散,整理得到频域-波数域内的有限元控制方程,其矩阵形式如下:
(˜ˉK−ω2M)˜ˉU=˜ˉF, (7) 式中:˜ˉK为刚度矩阵;M为质量矩阵;˜ˉU为位移列阵;˜ˉF为等效节点力列阵。
为消除模型截断边界处的反射波对计算结果造成影响,基于笔者先前的研究[1],采用无限元边界作为模型的边界条件。此外,高速铁路地面环境振动特性研究中通常仅考虑单次列车荷载作用,不同于列车循环荷载,单次列车荷载引起的土体固结沉降可忽略不计[1]。因此,本文所建立路堑段2.5维有限元模型中各部分之间采用共节点的方式链接。
2.3 数值方法验证
为验证本文2.5维有限元方法的正确性,基于前文TGV列车(表 2、图 4)和路堑测试段参数(图 3、表 1),建立高铁荷载下路堑段2.5维有限元模型。考虑车速294.7 km/h,路堑段地面竖向振动加速度峰值随测点与轨道距离衰减的实测与计算结果如图 9所示。由图可知,本文建立的2.5维有限元模型能较好地反映出高铁荷载下地面振动随测点与轨道距离的衰减趋势,与实测值相比,计算误差不超过13%,满足精度要求,验证了模型的正确性和可靠性。
3. 路堑参数对地面振动的影响
考虑单线轨道,建立如图 8所示的路堑段2.5维有限元模型,模型宽100.0 m、深35.0 m,路堑底面宽度为8.6 m。选取CRTS II型板式无砟轨道[5],并模拟为铺设在路基上的Euler梁。地基土体的弹性模量E、泊松比ν、阻尼比ξ、密度ρ和瑞利波速vR分别为64.0 MPa,0.38,0.05,1850.0 kg/m3,382.68 km/h。综合考虑计算效率与精度,选取6节编组的CRH380 AL型动车组作为列车荷载[5],分析路堑设计参数对地面环境振动特性的影响。
3.1 路堑深度的影响
考虑车速为380.0 km/h,路堑边坡坡度为1.00∶1.25,不同路堑深度条件下(2.0,4.0,6.0,8.0 m)地面竖向振动加速度峰值随测点与轨道中心距离的变化曲线如图 10所示,并增设0.0 m的无路堑工况进行对比分析。由图 10可知,不同路堑深度条件下的地面振动均小于无路堑工况(0.0 m)。既有研究指出近轨道处的地面振动衰减由几何阻尼主导[9],路堑的存在增加了近轨道处的几何阻尼,从而减小了高铁运行引起的地面振动加速度峰值,且减振效果随路堑深度增加逐渐增强。当路堑深度≥6.0 m时,继续增加路堑深度将难以进一步有效减小地面环境振动。此外,由于堑顶处的瑞利波绕射[6],不同路堑深度条件下(2.0,4.0,6.0,8.0 m)其堑顶处附近(分别距轨道中心6.8,9.3,11.8,14.3 m)均可观察到地面振动的局部放大现象。
3.2 路堑边坡坡度的影响
我国高速铁路路堑边坡的设计坡度通常介于1.00∶1.75~1.00∶0.75之间[10]。考虑路堑深度为6.0 m,图 11为车速380.0 km/h时不同路堑边坡坡度条件下(1.00∶1.75~1.00∶0.75)地面竖向振动加速度峰值随测点与轨道中心距离的衰减曲线。由图 11(a)可知,当路堑边坡坡度在1.00∶1.25~1.00∶0.75(38.7°~53.1°)范围内时,地面环境振动随路堑边坡坡度的增大而减小。这主要与瑞利波在堑顶处的绕射程度有关,既有研究指出[6],当路堑边坡坡度在40.0°~60.0°范围内时,堑顶处瑞利波的绕射随坡度增大而减小,从而降低了高铁运行引起的路堑段地面振动。此外,随着路堑边坡坡度的进一步减小(图 11(b)),坡度变化对地面振动加速度峰值的影响较小。因此,实际工程中在保证路堑边坡安全稳定的前提下,较陡的路堑边坡更有利于减小高铁荷载下路堑段的地面环境振动。
4. 结论
(1)列车轴重对路堑段近轨道处的地面振动幅值有重要影响,随测点与轨道距离的增加,地面振动幅值逐渐衰减,中间车相邻转向架轮对引起的叠加效应对地面振动幅值的影响逐渐增强。
(2)路堑段地面振动随测点与轨道距离的衰减过程大致可分为3个阶段,且堑顶处有较明显的振动局部放大现象。中高频成分振动的衰减速率明显大于其他频段,且振动1阶主频由列车荷载的基频(f1=c/L1)主导。
(3)高铁荷载下地面振动随路堑深度增加而减小。当路堑深度超过某一限值(本文为6.0 m)时,继续增加路堑深度难以进一步有效降低地面环境振动。
(4)路堑段地面振动随路堑边坡坡度的增大而减小。在保证路堑边坡稳定性的前提下,较陡的路堑边坡更有利于减小高铁运行引起的地面环境振动。
-
-
[1] 石钰锋, 蔡理平, 阳军生, 等. 富水软弱地层隧道水平旋喷与大管棚预支护研究及应用[J]. 岩土工程学报, 2015, 37(增刊2): 101-106. doi: 10.11779/CJGE2015S2021 SHI Yufeng, CAI Liping, YANG Junsheng, et al. Combination reinforcement mechanism of sub-horizontal jet-grouting and pipe roof in water-rich soft stratum[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(S2): 101-106. (in Chinese) doi: 10.11779/CJGE2015S2021
[2] 宋战平, 田小旭, 周冠南, 等. 隧道洞内管棚超前预支护力学行为的理论分析[J]. 中国公路学报, 2020, 33(4): 89-98. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGGL202004009.htm SONG Zhanping, TIAN Xiaoxu, ZHOU Guannan, et al. Theoretical analysis of mechanical behavior of advanced pre-support of pipe-roof in tunnel[J]. China Journal of Highway and Transport, 2020, 33(4): 89-98. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-ZGGL202004009.htm
[3] 武松, 汤华, 罗红星, 等. 浅埋软岩公路隧道超前管棚支护机制与工程应用研究[J]. 岩石力学与工程学报, 2019, 38(增刊1): 3080-3091. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2019S1049.htm WU Song, TANG Hua, LUO Hongxing, et al. Research on mechanism and engineering application of advanced support of pipe-roof for shallow buried and soft rock highway tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2019, 38(S1): 3080-3091. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2019S1049.htm
[4] 郭璇, 张鸿儒, 蒙蛟, 等. 软弱围岩隧道管棚预支护开挖土压分布模型试验[J]. 岩石力学与工程学报, 2016, 35(6): 1214-1224. GUO Xuan, ZHANG Hongru, MENG Jiao, et al. Model test to earth pressure distribution on pipe roof of tunnels as pre-supporting system in weak surrounding rock[J]. Chinese Journal of Rock Mechanics and Engineering, 2016, 35(6): 1214-1224. (in Chinese)
[5] LUO Y B, CHEN J X, LIU B, et al. Analysis of pipe-roof in tunnel exiting portal by the foundation elastic model[J]. Mathematical Problems in Engineering, 2017: 1-12.
[6] 黄华, 巩江峰, 邸成, 等. 铁路隧道超前管棚变形规律及参数研究[J]. 铁道工程学报, 2019, 36(12): 65-70. https://www.cnki.com.cn/Article/CJFDTOTAL-TDGC201912012.htm HUANG Hua, GONG Jiangfeng, DI Cheng, et al. Research on the deformation law and parameters of advanced pipe shed for railway tunnel[J]. Journal of Railway Engineering Society, 2019, 36(12): 65-70. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TDGC201912012.htm
[7] XIAO J Z, DAI F C, WEI Y Q, et al. Analysis of mechanical behavior in a pipe roof during excavation of a shallow bias tunnel in loose deposits[J]. Environmental Earth Sciences, 2016, 75(4): 293.
[8] LI R, ZHANG D L, WU P, et al. Combined application of pipe roof pre-SUPPORT and curtain grouting pre-reinforcement in closely spaced large span triple tunnels[J]. Applied Sciences, 2020, 10(9): 3186.
[9] 周顺华. 软弱地层浅埋暗挖施工中管棚法的棚架原理[J]. 岩石力学与工程学报, 2005, 24(14): 2565-2570. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX200514027.htm ZHOU Shunhua. Principles of pipe roof applied to shallow-buried tunnels in soft ground[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(14): 2565-2570. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX200514027.htm
[10] 顾问宇, 李伟, 冯金英. 管棚超前支护在平顶直墙隧道中的优化设计[J]. 现代隧道技术, 2009, 46(3): 48-52, 59. https://www.cnki.com.cn/Article/CJFDTOTAL-XDSD200903012.htm GU Wenyu, LI Wei, FENG Jinying. Optimized design of advance pipe-roofing for tunnels with flat roof and vertical walls[J]. Modern Tunnelling Technology, 2009, 46(3): 48-52, 59. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XDSD200903012.htm
[11] 蒋良潍, 黄润秋, 蒋忠信. 黏性土桩间土拱效应计算与桩间距分析[J]. 岩土力学, 2006, 27(3): 445-450. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX200603022.htm JIANG Liangwei, HUANG Runqiu, JIANG Zhongxin. Analysis of soil arching effect between adjacent piles and their spacing in cohesive soils[J]. Rock and Soil Mechanics, 2006, 27(3): 445-450. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX200603022.htm
[12] 孙玉永, 周顺华, 肖红菊, 等. 管棚法应用于软土地层的稳定性分析[J]. 岩石力学与工程学报, 2013, 32(S2): 4199-4206. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2013S2149.htm SUN Yuyong, ZHOU Shunhua, XIAO Hongju, et al. Application of pipe-roof method to stability analysis of soft ground[J]. Chinese Journal of Rock Mechanics and Engineering, 2013, 32(S2): 4199-4206. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2013S2149.htm
[13] 陈峥, 何平, 颜杜民, 等. 考虑土拱效应的管棚合理间距计算方法[J]. 岩土力学, 2019, 40(5): 1993-2000. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201905044.htm CHEN Zheng, HE Ping, YAN Dumin, et al. A method to calculate rational spacing between pipes in pipe roofs considering soil arching effects[J]. Rock and Soil Mechanics, 2019, 40(5): 1993-2000. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201905044.htm
[14] ZAREI H, MOAREFVAND P, SALMI E F. Numerical modeling of umbrella arch technique to reduce tunnelling induced ground movements[J]. Environmental Earth Sciences, 2019, 78(10): 1-22.
[15] BAGHERZADEH P, GOSHTASBI K, KASHEF M. Umbrella arch method performance, structural behavior and design elements utilizing in collapsing zones[J]. Environmental Earth Sciences, 2020, 79(23): 521.
[16] 李鹏飞, 王帆. 深埋非对称小间距隧道围岩压力计算方法[J]. 北京工业大学学报, 2017, 43(4): 612-620. LI Pengfei, WANG Fan. Calculation method of loosening pressure for deep-buried and non-symmetry closely-spaced tunnels[J]. Journal of Beijing University of Technology, 2017, 43(4): 612-620. (in Chinese)
[17] 贾金青, 王海涛, 涂兵雄, 等. 管棚力学行为的解析分析与现场测试[J]. 岩土力学, 2010, 31(6): 1858-1864. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201006031.htm JIA Jinqing, WANG Haitao, TU Bingxiong, et al. Analytical approach and field monitoring for mechanical behaviors of pipe roof reinforcement[J]. Rock and Soil Mechanics, 2010, 31(6): 1858-1864. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201006031.htm
[18] 郑俊杰, 章荣军, 杨庆年. 浅埋隧道变基床系数下管棚的力学机制分析[J]. 岩土工程学报, 2009, 31(8): 1165-1171. http://cge.nhri.cn/cn/article/id/13331 ZHENG Junjie, ZHANG Rongjun, YANG Qingnian. Mechanical mechanism of piperoofs with variable coefficient of subgrade reaction in shallow tunnels[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(8): 1165-1171. (in Chinese) http://cge.nhri.cn/cn/article/id/13331
[19] ZHANG Z Q, LI H Y, LIU H Y, et al. Load transferring mechanism of pipe umbrella support in shallow-buried tunnels[J]. Tunnelling and Underground Space Technology, 2014, 43: 213-221.
[20] 王同涛, 闫相祯, 杨秀娟. 基于弹塑性地基模型的湿陷性黄土地段悬空管道受力分析[J]. 中国石油大学学报(自然科学版), 2010, 34(4): 113-118. https://www.cnki.com.cn/Article/CJFDTOTAL-SYDX201004022.htm WANG Tongtao, YAN Xiangzhen, YANG Xiujuan. Force analysis of suspended pipeline in collapsible loess areas based on elastic-plastic foundation model[J]. Journal of China University of Petroleum (Edition of Natural Science), 2010, 34(4): 113-118. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-SYDX201004022.htm
[21] 李然, 张顶立, 房倩, 等. 深埋3孔小净距隧道围岩压力计算方法及其工程应用[J]. 中国铁道科学, 2020, 41(2): 81-90. https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK202002010.htm LI Ran, ZHANG Dingli, FANG Qian, et al. Calculation method for surrounding rock pressure of deeply buried closely spaced triple tunnels and its engineering application[J]. China Railway Science, 2020, 41(2): 81-90. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-ZGTK202002010.htm
[22] WHITE D J, VENNAPUSA P, ROESLER J R, et al. Plate load testing on layered pavement foundation system to characterize mechanistic parameters[C]//Eighth International Conference on Case Histories in Geotechnical Engineering. Philadelphia, Pennsylvania. Reston, VA, USA: American Society of Civil Engineers, 2019: 214-226.
[23] 满帅, 孔超, 王海彦. 隧道洞口浅埋段管棚超前支护开挖进尺优化[J]. 铁道标准设计, 2013, 57(10): 108-111, 132. https://www.cnki.com.cn/Article/CJFDTOTAL-TDBS201310026.htm MAN Shuai, KONG Chao, WANG Haiyan. Optimization of excavation footage of shallowly-buried section of tunnel portal supported by advance pipe roof[J]. Railway Standard Design, 2013, 57(10): 108-111, 132. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TDBS201310026.htm
-
其他相关附件