基坑立柱桩隆起分析及简化计算

翟礼嘉, 丁智, 王金艳

翟礼嘉, 丁智, 王金艳. 基坑立柱桩隆起分析及简化计算[J]. 岩土工程学报, 2014, 36(zk2): 70-76. DOI: 10.11779/CJGE2014S2012
引用本文: 翟礼嘉, 丁智, 王金艳. 基坑立柱桩隆起分析及简化计算[J]. 岩土工程学报, 2014, 36(zk2): 70-76. DOI: 10.11779/CJGE2014S2012
ZHAI Li-jia, DING Zhi, WANG Jin-yan. Simplified calculation of heaving of soldier piles during excavation of foundation pits[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 70-76. DOI: 10.11779/CJGE2014S2012
Citation: ZHAI Li-jia, DING Zhi, WANG Jin-yan. Simplified calculation of heaving of soldier piles during excavation of foundation pits[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 70-76. DOI: 10.11779/CJGE2014S2012

基坑立柱桩隆起分析及简化计算  English Version

基金项目: 杭州市科技计划项目(20130533B28)
详细信息
    作者简介:

    翟礼嘉(1982- ),男,工程师,主要从事地下工程设计与研究。E-mail: zhai_lj99@sina.com。

Simplified calculation of heaving of soldier piles during excavation of foundation pits

  • 摘要: 立柱桩隆起可能导致基坑内支撑系统失稳,严重时可能导致结构开裂甚至破坏,但是目前尚未有明确、系统的计算方法。基于对基坑卸荷应力与回弹变形的认识,针对不同的开挖工况,分析桩、土间由于回弹影响深度不同而出现的两种相互关系,计算分析了部分典型上部结构的刚度影响,提出了立柱桩隆起的简化计算方法。将计算结果与实测值进行对比验证,提出了部分修正参数,验证了该计算方法的可靠性。
    Abstract: The heave of soldier piles in foundation pit may lead to system instability and structural cracking or failure. So far, there is no theoretical way for calculating the heaving soldier piles. Based on the unloading stress and rebound deformation of excavations, a simplified method for the heave of soldier piles is proposed considering two types of relations between the depth of the rebound effect under different excavation conditions. The influence of some typical upper structures on stiffness is analyzed. The calculated results are compared with the measured values. Some corrected parameter are proposed. The feasibility of the proposed method is validated.
  • [1] GB 50007—2011 建筑地基基础设计规范[S]. 2011. (GB 50007—2011 Code for design of building foundation[S]. 2011. (in Chinese))
    [2] POULOS H G, DAVIE E H. Pile foundation analysis and design[M]. New York: Wiley, 1980.
    [3] 贺 翀. 深基坑的立柱桩隆起计算[J]. 岩土工程学报, 2010, 32(增刊1): 74-78. (HE Chong. Calculation of heave of soldier piles in deep foundation pits[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(S1): 74-78. (in Chinese))
    [4] 杨 敏, 逯建栋. 深开挖基坑回弹引起的坑中桩受力与位移计算[J]. 同济大学学报(自然科学版), 2010, 38(12): 1730-1735. (YANG Min, LU Jian-dong. A calculation of behavior of underpinning pile subject to excavation of deep foundation pit[J]. Journal of Tongji University (Natural Science), 2010, 38(12): 1730-1735. (in Chinese))
    [5] 楼晓明, 杨 晶, 李德宁, 等. 立柱桩在深基坑分步开挖过程中的上拔位移分析[J]. 岩土工程学报, 2013, 35(1): 193-198. (LOU Xiao-ming, YANG Jing, LI De-ning, et al. Uplift displacement of soldier piles during stepped excavation of deep foundation pits[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(1): 193-198. (in Chinese))
    [6] 胡 琦, 凌道盛, 陈云敏, 等. 深基坑开挖对坑内基桩受力特性的影响分析[J]. 岩土力学, 2008, 29(7): 1965-1970. (HU Qi, LING Dao-sheng, CHEN Yun-min, et al. Study of loading characters of pile foundation due to unloading of deep foundation pit excavation[J]. Rock and Soil Mechanics, 2008, 29(7): 1965-1970. (in Chinese))
    [7] 巢 斯, 王 磊, 雷小虎, 等. 上海软土地区深基坑回弹引起桩拉力的探讨[J]. 结构工程师, 2009, 25(5): 88-92. (CHAO Si, WANG Lei, LEI Xiao-hu, et al. Discussion on tensile force of piles caused by subsoil rebound in soft soil area[J]. Structural Engineers, 2009, 25(5): 88-92. (in Chinese))
    [8] 肖 健. 考虑工程桩存在的深基坑回弹空间效应有限元分析[D]. 天津: 天津大学, 2004. (XIAO Jian. FEM analysis on 3D behavior of the pit resilience considering foundation piles[D]. Tianjin: Tianjin University, 2004. (in Chinese))
    [9] 范 巍. 大面积深基坑开挖过程中桩基受力特性研究[D]. 上海: 上海交通大学, 2007. (FAN Wei. Behavior of pile foundation during large-scale deep excavation[D]. Shanghai: Shanghai Jiao Tong University, 2007.(in Chinese))
    [10] 葛强强. 超深开挖对单桩承载性状的影响性研究[D]. 天津: 天津大学, 2008. (GE Qiang-qiang. Impact of ultra-deep excavation on bearing capacity of single pile[D]. Tianjin: Tianjin University, 2008. (in Chinese))
    [11] 楼晓明, 李德宁, 刘建航. 深基坑坑底地基的回弹应力与回弹变形[J]. 土木工程学报, 2012, 45(4): 134-138. (LOU Xiao-ming, LI De-ning, LIU Jian-hang. Rebound stress and deformation below the bottom of deep excavations[J]. China Civil Engineering Journal, 2012, 45(4): 134-138. (in Chinese))
    [12] 刘国彬, 黄院雄, 侯学渊. 基坑回弹的实用计算法[J]. 土木工程学报, 2000, 33(4): 61-67. (LIU Guo-bin, HUANG Yuan-xiong, HOU Xue-yuan. A practical method for calculating a heave of excavated foundation[J]. China Civil Engineering Journal, 2000, 33(4): 61-67. (in Chinese))
    [13] JGJ 94—2008 建筑桩基技术规范[S]. 2008. (JGJ 94—2008 Technical code for building pile foundations[S]. 2008. (in Chinese))
    [14] 上海岩土工程勘察设计研究院有限公司. 杭州地铁4号线一期工程:景芳路站岩土工程勘察报告[R]. (Shanghai Geotechnical Engineering Investigation Design & Research Institute Co Ltd. The first phase project of Hangzhou Metro Line 4: Jing Fang road station of geotechnical engineering investigation report[R]. (in Chinese))
    [15] 刘国彬, 王卫东. 基坑工程手册[M]. 北京: 中国建筑工业出版社, 2009. (LIU Guo-bin, WANG Wei-dong. Foundation pit engineering handbook[M]. Beijing: China Architecture and Building Press, 2009. (in Chinese))
    [16] 李建民, 滕延京. 土样回弹及再压缩变形特征的试验研究[J]. 工程勘察, 2010(12): 9-14. (LI Jian-min, TENG Yan-jing. Experimental study on the characteristics of the rebound and the recompression deformation of soil under unloading[J]. Geotechnical Investigation & Surveying, 2010(12): 9-14. (in Chinese))
  • 期刊类型引用(6)

    1. 许盛,杨明山,唐志勇,杨皓宇,李小兴,刘念. 察尔汗盐湖地区饱和盐渍软土地基处理. 人民长江. 2024(S2): 178-184 . 百度学术
    2. 何鸿烈,杨扬,王志壮,司宁强,李生泽. 戈壁料高填方强夯补强应用研究. 建筑施工. 2023(03): 534-537 . 百度学术
    3. 张学军. 强夯压实技术在路基补强施工的应用及优化. 建筑机械. 2023(07): 61-66+70 . 百度学术
    4. 赵延林,龚雨林,张子煜. 深厚换填砂土地基强夯有效加固深度的影响因素. 黑龙江科技大学学报. 2023(05): 710-717 . 百度学术
    5. 刘文俊,李岳,蔡靖,戴轩,水伟厚,董炳寅. 基于强夯应力波传播模型的夯击参数研究. 岩土力学. 2023(S1): 427-435 . 百度学术
    6. 秦劭杰,戎晓宁,张路银,彭梦凯,董炳寅. 特殊场地强夯振动监测及隔振效果研究. 地基处理. 2023(S2): 84-90 . 百度学术

    其他类型引用(7)

计量
  • 文章访问数:  478
  • HTML全文浏览量:  2
  • PDF下载量:  295
  • 被引次数: 13
出版历程
  • 收稿日期:  2014-07-27
  • 发布日期:  2014-07-27