[1] |
何颐华, 杨 斌, 金宝森, 等. 双排护坡桩试验与计算的研[J]. 建筑结构学报, 1996, 17(2): 58–56. (HE Yi-hua, YANG Bin, JIN Bao-sen, et al. A study on the test and calculation of double-row fender piles[J]. Journal of Building Structures, 1996, 17(2): 58–56. (in Chinese))
|
[2] |
郑 刚, 李 欣, 刘 畅, 等. 考虑桩土相互作用的双排桩分析[J]. 建筑结构学报, 2004, 25(1): 99–106. (ZHENG Gang, LI Xin, LIU Chang, et al. Analysis of double-row piles in consideration of the pile-soil interaction[J]. Journal of Building Structures, 2004, 25(1): 99–106. (in Chinese))
|
[3] |
聂庆科, 胡建敏, 吴 刚. 深基坑双排桩支护结构上的变形和土压力研究[J]. 岩土力学报, 2008, 29(11): 3089–3094. (NIE Qing-ke, HU Jian-min, WU Gang. Deformation and earth pressure of a double-row piles retaining structure for deep excavation[J]. Rock and Soil Mechanics, 2008, 29(11): 3089–3094. (in Chinese))
|
[4] |
曹俊坚, 平 扬, 朱长歧, 等. 考虑圈梁空间作用的深基坑双排桩支护计算方法研究[ J]. 岩石力学与工程学报, 1999, 18(6): 709–712. (CAO Jun-jian, PING Yang, ZHU Chang-qi, et al. Study on the calculation method of bracing with double-row piles of deep foundation pit with consideration of the spatial influence of the ring beam[J]. Chinese Journal of Rock Mechanics and Engineering, 1999, 18(6): 709–712. (in Chinese))
|
[5] |
王 军, 王 磊, 肖昭然. 双排桩支护排距的有限元分析与研究[J]. 地下空间与工程学报, 2005, 1(6): 1096–1099. (WANG Jun, WANG Lei, XIAO Zhao-ran. Analysis of the interval between double-row piles by finite element method[J]. Chinese Journal of Underground Space and Engineering, 2005, 1(6): 1096–1099. (in Chinese))
|