[1] |
吴 献, 唐 彪. 逆作法中几种立柱的调垂方法[J]. 建筑技术, 2004, 35(2): 137–138. (WU Xian, TANG Biao. Inverse practices of several tune vertical column construction technology[J]. Construction Technology, 2004, 35(2): 137–138. (in Chinese))
|
[2] |
DG/TJ08—61—2010 基坑工程技术规范[S]. (DG/TJ08—61—2010 Technical code for excavation engineering[S]. (in Chinese))
|
[3] |
康 忠. 逆作法施工中一柱一桩的施工方法与技术保证措施[J]. 建筑施工, 1999, 21(3): 38–40. (KANG Zhong. Reverse construction of a column of a construction method and technology to ensure measures[J]. Building Construction, 1999, 21(3): 38–40. (in Chinese))
|
[4] |
卢永存. 建筑结构逆作区一柱一桩工程施工技术[J]. 建筑施工, 2005, 27(10): 35–42. (LU Yong-cun. Engineering technology of one column one pile for area of architectural structure with top-down construction method[J]. Building Construction,2005, 27(10): 35–42. (in Chinese))
|
[5] |
顾国明. 超长钢格构柱垂直度实时监控系统[J]. 施工技术, 2009, 8: 53–56. (GU Guo-ming. Real-time monitoring system of super-long steel lattice column verticality[J]. Construction Mechanization, 2009, 8: 53–56. (in Chinese))
|
[6] |
廖秋林. 南京德基广场逆作法超深支撑桩柱施工技术[J]. 建筑技术, 2009, 38(9): 60–63. (LIAO Qiu-lin. Reverse construction technology of super-deep support piles and columns in Nanjing Deji Plaza[J]. Construction Technology, 2009, 38(9): 60–63. (in Chinese))
|
[7] |
吴 献, 李定江, 张为江. 逆作法施工中支承格构柱采用气囊法智能调垂施工技术[J]. 建筑施工, 2003, 25(1): 12–14. (WU Xian, LI Ding-jiang, ZHANG Wei-jiang. Intellectualized technique for making supporting lattice column perpendicular by air cell in top-down construction method[J]. Building Construction, 2003, 25(1): 12–14. (in Chinese))
|
[8] |
杨学林, 周平槐. 逆作地下室设计中的若干关键问题[J]. 岩土工程学报, 2010, 32(增刊1): 238–244. (YANG Xue-lin, ZHOU Ping-huai. Some key problems in design of basements using top-down method[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(S1): 238–244. (in Chinese))
|