Key technique for long and large-span deep foundation pits under complicated conditions using cover-cut method
-
摘要: 随着我国基础建设的不断发展,盖挖深基坑在城市地铁工程中得到了广泛的应用,取得了良好的社会和经济效益。深圳地铁5号线盖挖深基坑的规模宽度达24 m,长度达722 m,在全国实为罕见,对此基坑在围护结构、降水及结构施工中遇到的难题进行攻关。通过实践及对关键技术进行了总结,为类似工程提供参考。Abstract: The deep foundation pit by using the cover-cut method is widely applied in the construction of metro projects. This method has proved to be an economic and practical way. A case in Shenzhen Metro Line No. 5 is studied. The pit is 24 m deep, 722 m long, and under complicated conditions. The difficulties encountered in retaining structure, pit dewatering and structure construction during the construction process are studied. The summary based on the practice of key technique can be a reference for similar projects.
-
Keywords:
- complicated condition /
- large span /
- deep foundation pilt /
- cover-cut method
-
[1] 龚晓南. 复合地基理论及工程应用[M]. 北京: 中国建筑工业出版社, 2002. (GONG Xiao-nan. Theory of composite foundations and engineering applications[M]. Beijing: China Architecture and Building Press, 2002. (in Chinese)) [2] 史佩栋. 实用桩基工程手册[M]. 北京: 中国建筑工业出版社, 1999. (SHI Pei-dong. Practical handbook for pile foundation engineering[M]. Beijing: China Architecture and Building Press, 1999. (in Chinese)) [3] 王 平. 某超深永久基坑的止水、降水设计和施工综合技术[J]. 岩土工程学报, 2006, 28(增刊): 705–709. (WANG Ping. Water sealing and dropping design and comprehensive construction technology of over-deep permanent foundation pit[J]. Chinese Jounal of Geotechnical Engineering, 2006, 28(S0): 705–709. (in Chinese))
计量
- 文章访问数:
- HTML全文浏览量: 0
- PDF下载量: