[1] |
宋洁人. 上海莲花河畔景苑7号楼整体倾覆原因分析[J]. 建筑技术, 2010, 41(9): 843–846. (SONG Jie-ren. Analysis on reasons for integral collapse of Shanghai Lotus River Garden no.7 building[J]. Architecture Technology, 2010, 41(9): 843–846. (in Chinese))
|
[2] |
黄宏伟, 边亦海. 深基坑工程施工中的风险管理[J]. 地下空间与工程学报, 2005, 1(4): 611–614. (HUANG Hong-wei, BIAN Yi-hai. Risk management in the construction of deep excavation engineering[J].Chinese Journal of Underground Space and Engineering, 2005, 1(4): 611–614. (in Chinese))
|
[3] |
张小平, 王 杰, 胡明亮. 事故树分析在排桩基坑工程安全评价中的应用研究[J]. 岩土工程学报, 2011, 33(6): 1892–1896. (ZHANG Xiao-ping, WANG Jie, HU Ming-liang. Application of FTA in safety assessment of row piles of excavation engineering[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(6): 1892–1896. (in Chinese))
|
[4] |
兰守奇, 张庆贺. 基于模糊理论的深基坑施工期风险评估 [J]. 岩土工程学报, 2009, 31(4): 648–652. (LAN Shou-qi, ZHANG Qing-he. Risk assessment of deep excavation during construction based on fuzzy theory[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(4): 648–652. (in Chinese))
|
[5] |
DG/TJ08—61—2010 基坑工程技术规范[S]. 2010. (DG/TJ08—61—2010 Technical code for excavation engineering[S]. 2010. (in Chinese))
|
[6] |
CASPE M S. Surface settlement adjacent to braced open cuts[J]. Journal of the Soil Mechanics and Foundations Division, ASCE, 1966, 92(SM4): 51–59.
|
[7] |
丁勇春. 软土地区深基坑施工引起的变形及控制研究(博士学位论文)[D]. 上海: 上海交通大学, 2009. (DING Yong-chun. Excavation-induced deformation and control in soft deposits[D]. Shanghai: Shanghai Jiaotong University, 2009. (in Chinese))
|
[8] |
隋鹏程, 陈宝智, 隋 旭. 安全原理[M]. 北京: 化学工业出版社, 2005. (SUI Peng-cheng, CHEN Bao-zhi, SUI Xu. Safety principles[M]. Beijing: Chemical Industry Press, 2005. (in Chinese))
|
[9] |
中华人民共和国建设部. 地铁及地下工程建设风险管理指南[M]. 北京: 中国建筑工业出版社, 2007. (Ministry of Construction of the People's Republic of China. Guideline of risk management for construction of subway and underground works[M]. Beijing: China Architecture and Building Press, 2007. (in Chinese))
|