[1] |
余庆锋, 吴立. 高速铁路隧道岩溶突水发生机理研究[J]. 科学技术与工程, 2015, 15(30): 199-205. (YU Qing-feng WU Li. Study on karst water inrush mechanism in high-speed railway tunnel[J]. Science Technology and Engineering, 2015, 15(30): 199-205. (in Chinese))
|
[2] |
刘建, 刘丹, 宋凯. 渝怀铁路歌乐山隧道排水的地下水环境负效应评价[J]. 现代隧道技术, 2012, 49(4): 179-183. (LIU Jian, LIU Dan, SONG Ka.Evaluation of the negative effects on groundwater environment resulted by Geleshan tunnel drainage[J]. Modern Tunnelling Technology, 2012, 49(4): 179-183. (in Chinese))
|
[3] |
单士军, 李耐霞. 歌乐山隧道施工过程环境影响分析及建议[J]. 工业安全与环保, 2004, 30(11): 21-22. (SHAN Shi-jun, LI Nai-xia.The analysis and suggestion of environmental impact on Geleshan tunnel construction[J]. Industrial Safety and Environmental Protection, 2004, 30(11): 21-22. (in Chinese))
|
[4] |
刘志春, 朱永全, 高新强, 等. 干旱山区隧道施工地下水环境保护技术研究[R]. 石家庄: 石家庄铁道大学, 2010. (LIU Zhi-chun, ZHU Yong-quan, GAO Xin-qiang, et al.Study on technology of groundwater environment protection during tunnel construction in the arid mountain area[R]. Shijiazhuang: Shijiazhuang Tiedao University, 2010. (in Chinese))
|
[5] |
付钢, 王磊. 高压富水地层中隧道衬砌结构设计方法探讨[J]. 地下空间与工程学报, 2007, 3(2): 252-257. (FU Gang, WANG Lei.Study on design method of lining structure of the highway tunnel in deep-lying stratum with highwater level[J]. Chinese Journal of Under ground Space and Engineering, 2007, 3(2): 252-257. (in Chinese))
|
[6] |
赵瑞, 许模, 范辰辰. 隔挡式背斜区隧道群地下水渗流场模拟演化[J]. 现代隧道技术, 2015, 52(3): 69-74. (ZHAO Rui, XU Mo, FAN Chen-chen.Numerical simulation of the groundwater seepage field of a tunnel group in an ejective anticline zone[J]. Modern Tunnelling Technology, 2015, 52(3): 69-74. (in Chinese))
|
[7] |
刘志春, 万良勇. 地层注浆加固对隧道与地下水相互作用过程中的“双赢”影响效应分析[J]. 现代隧道技术, 2015, 52(2): 87-96. (LIU Zhi-chun, WAN Liang-yong.Win-win effect of ground consolidation grouting on the interaction between tunnel and groundwater[J]. Modern Tunnelling Technology, 2015, 52(2): 87-96. (in Chinese))
|
[8] |
王建宇. 再谈隧道衬砌水压力[J]. 现代隧道技术, 2003, 40(3): 5-10. (WANG Jian-yu.Once more on hydraulic pressure upon lining[J]. Modern Tunnelling Technology, 2003, 40(3): 5-10. (in Chinese))
|
[9] |
王秀英, 王梦恕, 张弥. 计算隧道排水量及衬砌外水压力的一种简化方法[J]. 北方交通大学学报, 2004, 28(1): 8-10. (WANG Xiu-ying, WANG Meng-shu, ZHANG Mi.A simple method to calculate tunnel discharge and external water pressure on lining[J]. Journal of Northern Jiaotong University, 2004, 28(1): 8-10. (in Chinese))
|
[10] |
皇甫明, 谭忠盛, 王梦恕, 等. 暗挖海底隧道渗流量解析解及其应用[J]. 中国工程科学, 2009, 11(7): 66-70. (HUANGFU Ming, TAN Zhong-sheng, WANG Meng-shu, et al.An analytical solution for water inflow into a subsea tunnel and its application[J]. Journal of China Engineering Science, 2009, 11(7): 66-70. (in Chinese))
|
[11] |
杨会军, 王梦恕. 深埋长大隧道渗流数值模拟[J].岩石力学与工程学报, 2006, 25(3): 511-519. (YANG Hui-jun, WANG Meng-shu.Numerical simulation of seepage in deep-buried long and big tunnels[J]. Chinese Journal of Rock Mechanics and Engineering, 2006, 25(3): 511-519. (in Chinese))
|