[1] |
沈桂平, 曹文宏, 杨俊龙, 等. 管幕法综述[J]. 岩土工程界, 2006, 9(2): 27-29. (SHEN Gui-ping, CAO Wen-hong, YANG Jun-long, et al.Review of pipe-roof method[J]. Geotechnical Engineering World, 2006, 9(2): 27-29. (in Chinese))
|
[2] |
张云. 浅埋暗挖大跨度地铁车站施工技术[J]. 隧道建设, 2005, 25(2): 28-30, 43.(ZHANG Yun. Construction technology of shallow buried and dark digging large-span metro station[J]. Tunnel Construction, 2005, 25(2): 28-30, 43. (in Chinese))
|
[3] |
杨慧林. 新管幕工法修建地铁暗挖车站技术研究[D]. 成都: 西南交通大学, 2013. (YANG Hui-lin.Research on new tubular roof method applied to underground excavated subway station[D]. Chengdu: Southwest Jiaotong University, 2013. (in Chinese))
|
[4] |
葛金科. 饱和软土地层中管幕法隧道施工方案研究[J]. 上海公路, 2004(1): 38-43. (GE Jin-ke.Study on construction scheme of pipe-curtain tunneling in saturated soft soil stratum[J]. Shanghai Highway, 2004(1): 38-43. (in Chinese))
|
[5] |
李耀良. 张云海, 李伟强. 软土地区管幕法工艺研究与应用[J]. 地下空间与工程学报, 2011, 7(5): 962-967. (LI Yao-liang, ZHANG Yun-hai, LI Wei-qiang.Research and Application of Pipe Roofing Method in Soft Soil[J]. Chinese Journal of Underground Space and Engineering, 2011, 7(5): 962-967. (in Chinese))
|
[6] |
周晓敏, 苏立凡, 贺长俊, 等. 北京地铁隧道水平冻结法施工[J]. 岩土工程学报, 1999, 21(3): 319-322. (ZHOU Xiao-min, SU Li-fan, HE Chang-jun, et al.Horizontal ground freezing method applied to tunneling of Beijing underground railway system[J]. Chinese Journal of Geotechnical Engineering, 1999, 21(3): 319-322. (in Chinese))
|
[7] |
罗俊成, 史海鸥, 徐兵壮, 等. 长距离水平冻结法在广州地铁中的应用与实践[J]. 现代隧道技术, 2002, 39(4): 22-26. (LUO Jun-cheng, SHI Hai-ou, XU Bing-zhuang, et al.Application of Horizontal Ground Freezing Method to Guangzhou Metro[J]. Modern Tunnelling Technology, 2002, 39(4): 22-26. (in Chinese))
|
[8] |
肖朝昀. 人工地层冻结冻土帷幕形成与解冻规律研究[D]. 上海: 同济大学, 2007. (XIAO Zhao-yun.Research on the forming and thawing of frozen soil walls by artificial ground freezing method[D]. Shanghai: Tongji University, 2007. (in Chinese))
|
[9] |
张军. 地层液氮冻结法特性及冻结效果研究[D]. 上海: 同济大学, 2011. (ZHANG Jun.Research on freezing characteristics and freezing effect by liquid nitrogen[D]. Shanghai: Tongji University, 2011. (in Chinese))
|
[10] |
HU X D, GUO W, ZHANG L Y, et al.Application of liquid nitrogen freezing to recovery of a collapsed shield tunnel[J]. Journal of Performance of Constructed Facilities, 2014, 28(4): 04014002.
|
[11] |
陈湘生. 地层冻结法[M]. 北京: 人民交通出版社, 2013. (CHEN Xiang-sheng.Ground freezing method[M]. Beijing: China Communications Press, 2013. (in Chinese))
|
[12] |
余晶, 程勇, 贾瑞华. 港珠澳大桥珠海连接线拱北隧道方案论证[J]. 现代隧道技术, 2012, 49(1): 119-125+131. (YU Jing, CHENG Yong, JIA Rui-hua. Option Demonstration for the Gongbei Tunnel at the Zhuhai Link of the Hong Kong-Zhuhai-Macau Bridge[J]. Modern Tunnelling Technology, 2012, 49(1): 119-125+131.(in Chinese))
|
[13] |
程勇, 刘继国. 拱北隧道设计方案[J]. 公路隧道, 2012(3): 34-38. (CHENG Yong, LIU Ji-guo.Scheme designing of gongbei tunnel[J]. Highway Tunnel, 2012(3): 34-38. (in Chinese))
|
[14] |
HU X D, SHE S Y.Study of freezing scheme in freeze-sealing pipe roof method based on numerical simulation of temperature field[C]// CPTT 2012. Wuhan, 2012: 1798-1805.
|
[15] |
胡向东, 方涛. 管幕冻结法在隧道开挖及初期支护过程中温度场数值模拟分析[J]. 中国公路, 2013(增刊): 72-79. (HU Xiang-dong, FANG Tao.Numerical simulation of temperature field at the excavation and primary support period in tunnel construction using freeze-sealing pipe roof method[J]. China Highway, 2013(S0): 72-79. (in Chinese))
|
[16] |
HU X D, FANG T.Numerical simulation of temperature field at the active freeze period in tunnel construction using freeze-sealing pipe roof method[C]// Tunneling and Underground Construction. Shanghai, 2014: 731-741.
|
[17] |
汪洋. 管幕冻结法钢管-冻土复合结构力学性能研究[D]. 上海: 同济大学, 2013. (WANG Yang.Mechanical property analysis of steel pipe-frozen soil composite structure in freeze-sealing pipe roof method[D]. Shanghai: Tongji University, 2013. (in Chinese))
|
[18] |
胡向东, 任辉, 陈锦, 等. 管幕冻结法积极冻结方案模型试验研究[J]. 现代隧道技术, 2014, 51(5): 92-98. (HU Xiang-dong, REN Hui, CHEN Jin, et al.Model test study of the active freezing scheme for the combined pipe-roof and freezing method[J]. Modern Tunneling Technology, 2014, 51(5): 92-98. (in Chinese))
|
[19] |
任辉, 胡向东, 陈锦, 等. 异形加强冻结管在管幕冻结法中的冻结效果及使用方法研究[J]. 隧道建设, 2015, 35(11): 1169-1175. (REN Hui, HU Xiang-dong, CHEN Jin, et al.Study on freezing effect and operation of profiled enhancing freezing-tube in freeze-sealing pipe roof[J]. Tunnel Construction, 2015, 35(11): 1169-1175. (in Chinese))
|
[20] |
李志宏, 王文州, 胡向东, 等. 施工热扰动对管幕冻结止水帷幕影响研究[J]. 土木工程学报, 2015, 48(增刊2): 374-379. (LI Zhi-hong, WANG Wen-zhou, HU Xiang-dong, et al.Research on influence of construction thermal disturbance on the freezing-sealing pipe roof[J]. China Civil Engineering Journal, 2015, 48(S2): 374-379. (in Chinese))
|
[21] |
胡向东, 郭晓东, 王啟铜, 等. 管幕冻结法现场试验研究[J]. 隧道建设, 2015, 35(增刊2): 1-7. (HU Xiang-dong, GUO Xiao-dong, WANG Qi-tong, et al.Field test study on freezing technology of freeze-sealing pipe roof[J]. Tunnel Construction, 2015, 35(S2): 1-7. (in Chinese))
|
[22] |
张军, 胡向东, 任辉. 拱北隧道管幕冻结施工中限位管的冻结效果控制研究[J]. 隧道建设, 2015, 35(11): 1157-1163. (ZHANG Jun, HU Xiang-dong, REN Hui.Case study on control of freezing effect by installing limiting tubes in freezing-sealing pipe roof in Gongbei tunnel[J]. Tunnel Construction, 2015, 35(11): 1157-1163. (in Chinese))
|