小净距隧道群下穿既有运营隧道离心模型试验研究

金大龙, 袁大军, 韦家昕, 李兴高, 陆平

金大龙, 袁大军, 韦家昕, 李兴高, 陆平. 小净距隧道群下穿既有运营隧道离心模型试验研究[J]. 岩土工程学报, 2018, 40(8): 1507-1514. DOI: 10.11779/CJGE201808017
引用本文: 金大龙, 袁大军, 韦家昕, 李兴高, 陆平. 小净距隧道群下穿既有运营隧道离心模型试验研究[J]. 岩土工程学报, 2018, 40(8): 1507-1514. DOI: 10.11779/CJGE201808017
JIN Da-long, YUAN Da-jun, WEI Jia-xin, LI Xing-gao, LU Ping. Centrifugal model test of group tunneling with small spacing beneath existing tunnels[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(8): 1507-1514. DOI: 10.11779/CJGE201808017
Citation: JIN Da-long, YUAN Da-jun, WEI Jia-xin, LI Xing-gao, LU Ping. Centrifugal model test of group tunneling with small spacing beneath existing tunnels[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(8): 1507-1514. DOI: 10.11779/CJGE201808017

小净距隧道群下穿既有运营隧道离心模型试验研究  English Version

基金项目: 国家重点基础研究发展计划(“973”计划)项目(2015CB057800); 中央高校基本科研业务费专项资金资助项目(2016YJS109)
详细信息
    作者简介:

    金大龙(1988- ),男,主要从事盾构隧道施工方面研究。E-mail:jindalong@163.com。

Centrifugal model test of group tunneling with small spacing beneath existing tunnels

  • 摘要: 以深圳地铁7号线、9号线四条小净距隧道近距离下穿既有地铁1号线工程为研究背景,通过离心模型试验方法,分析了小净距隧道群施工对周围土体应力影响规律,揭示了盾构多次近距离穿越施工引起既有线变形及受力变化机理。研究表明:①小净距四线隧道开挖具有明显的“群洞效应”,隧道群的形成会导致松动区扩大、土拱向上扩展,从而引起新建隧道承受竖向土压力增加;②既有隧道沉降随穿越次数的增多而增大,最终沉降为4次穿越叠加的结果,峰值位置基本位于4条隧道中心线正上方,盾构隧道每次穿越引起沉降增幅为13%~48%,穿越区域横向影响范围可达60 m以上;③新建隧道的开挖对既有隧道环向弯矩的影响不大,弯矩变化不超过10%,而对既有隧道纵向弯矩影响较大,随着穿越次数增加纵向弯矩明显增大,这也是隧道下穿施工引起纵向裂缝和渗漏水的主要原因。结合数值模拟计算进行对比分析,得到规律与试验相一致,进一步验证了试验结果对实际工程的可靠性。
    Abstract: The existing metro line 1 in Shenzhen is under-crossed by four shield tunnels of metro line 7 and line 9 in close proximity. Based on the physical modeling of centrifuge tests, the influences on the stress of surrounding soil from construction of multiple tunneling in close proximity are analyzed. The deformation mechanism and stress characteristics of the existing tunnels induced by multiple under-crossing construction are investigated. The study shows that: (1) The group tunneling with small spacing can cause the ‘group-hole effect’ in the non-crossing region. The expanding of disturbed zones is the main reason for the soil pressure increasing above the new tunnels. (2) The settlement of the existing tunnels increases with each excavation process and reaches the final settlement as a result of four under-crossing superposition. The maximum settlement is above the center-line of four tunnels with the settlement trough width of more than 60 m. (3) The four shield tunnels in close proximity cause a significant increase in the longitudinal bending moment of the existing tunnels, while the circumferential moment changes a little. Therefore, segment fracture may appear after under-crossing construction. The test results are compared with the simulated ones, and they exhibit a similar change rule.
  • [1] 房明, 刘镇. 新建隧道盾构下穿施工对既有隧道影响的三维数值模拟[J]. 铁道科学与工程学报, 2011, 8(1): 67-72.
    (FANG Ming, LIU Zhen.3-D numerical simulation of influence of undercrossing shield construction on existing tunnel[J]. Journal of Railway Science and Engineering, 2011, 8(1): 67-72.(in Chinese))
    [2] 孙钧, 刘洪洲. 交叠隧道盾构法施工土体变形的三维数值模拟[J]. 同济大学学报 (自然科学版), 2002, 30(4): 379-385.
    (SUN Jun, LIU Hong-zhou.3-D numerical simulation of ground surface settlement under overlapped shield tunneling[J]. Journal of TongJi University (Natural Science Edition), 2002, 30(4): 379-385. (in Chinese))
    [3] 章慧健, 仇文革, 冯冀蒙. 小净距隧道夹岩力学特征分析[J]. 岩土工程学报, 2010, 32(3): 434-439.
    (ZHANG Hui-jian, QIU Wen-ge, FENG Ji-meng.Mechanical performance of shark rock of neighborhood tunnels[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(3): 434-439. (in Chinese))
    [4] 张顶立, 黄俊. 深圳地铁浅埋暗挖隧道地层变形分析[J].中国矿业大学学报, 2004, 33(5): 88-93.
    (ZHANG Ding-li, HUANG Jun.Analysis of ground deformation for shallow tunnel in Shenzhen city[J]. Journal of China University of Mining and Technology, 2004, 33(5): 88-93. (in Chinese))
    [5] 杨志勇, 江玉生. 盾构下穿地铁运营隧道沉降规律分析[J]. 西安科技大学学报, 2014, 34(3): 268-273.
    (YANG Zhi-yong, JIANG Yun-sheng.Analysis on settlement regularity when shields underneath pass subway tunnels[J]. Journal of Xi'an University of Science and Technology, 2014, 34(3): 268-273. (in Chinese))
    [6] 汪洋, 何川, 曾东洋, 等. 盾构隧道正交下穿施工对既有隧道影响的模型试验与数值模拟[J]. 铁道学报, 2010, 32(2): 79-85.
    (WANG Yang, HE Chuan, ZENG Dong-yang.Model test and numerical simulation of influence of perpendicular undercrosss shield tunnel construction on existing tunnel[J]. Journal of The China Railway Society, 2010, 32(2): 79-85. (in Chinese))
    [7] MARSHALL A M, KLAR A, MAIR R J.Tunneling beneath buried pipes: view of soil strain and its effect on pipeline behavior, Journal of Geotechnical and Geoenvironmental Engineering, 2010, 136(12): 1664-1672.
    [8] 黄德中, 马险峰, 王俊淞, 等. 软土地区盾构上穿越既有隧道的离心模拟研究[J]. 岩土工程学报, 2012(3): 520-527.
    (HUANG De-zhong, MA Xian-feng, WANG Jun-song, et al.Centrifuge modelling of effects of shield tunnels on existing tunnels in soft clay[J]. Chinese Journal of Geotechnical Engineering, 2012(3): 520-527. (in Chinese))
    [9] 邵华, 张子新. 盾构近距离穿越施工对已运营隧道的扰动影响分析[J]. 岩土力学, 2004, 25(增刊2): 545-546.
    (SHAO Hua, ZHANG Zi-xin.Influence analysis on shield tunnel undercrosss nearby existing tunnel[J]. Rock and Soil Mechanics, 2004, 25(S2): 545-546. (in Chinese))
    [10] 代翼飞, 孙磊, 张伟. 盾构隧道近距离下穿既有隧道的数值分析[J]. 土工基础, 2012, 26(2): 13-15.
    (DAI Yi-fei, SUN Lei, ZHANG Wei.Numerical simulation of shield tunnel undercrossing existing tunnel nearby[J]. Soil Engineering and Foundation, 2012, 26(2): 13-15. (in Chinese))
    [11] 白海卫, 何海健, 李玲. 正交下穿施工对上部既有隧道安全的影响研究[J]. 地下空间与工程学报, 2014, 10(2): 434-439.
    (BAI Hai-wei, HE Hai-jian, LI Ling.Study on longitudinal deformation and internal forces of upper existing metro tunnel caused by undercrossing tunneling[J]. Chinese Journal of Underground Space and Engineering, 2014, 10(2): 434-439. (in Chinese))
    [12] YAMAGUCHI I, YAMAZAKI I, KIRITANI Y.Study of ground-tunnel interactions of four shield tunnels driven in close proximity, in relation to design and construction of parallel shield tunnels[J]. Tunnelling and Underground Space Technology, 1998, 13(3): 289-304.
    [13] SOLIMAN E, DUDDECK H, AHRENS H.Two-and three- dimensional analysis of closely spaced double-tube tunnel[J]. Tunnelling and Underground Space Technology, 1993, 8(1): 13-18.
    [14] 凌昊, 仇文革, 孙兵, 等.双孔盾构隧道近接施工离心模型试验研究[J]. 岩土力学, 2010, 31(9): 2849-2853.
    (LING Hao, QIU Wen-ge, SUN Bing, et al.Study of adjacent construction of two tube shield tunnels by centrifugal model test[J]. Rock and Soil Mechanics, 2010, 31(9): 2849-2853. (in Chinese))
    [15] シールド工法の調査· 設計から施工まで編集委員会. シールド工法の調査· 設計から施工まで[ M]. 東京: 地盤工学会, 1997.
    (Editorial Committee of Shield Method, from Investigation and Design to Construction. Shield method, from investigation and design to construction[M]. Tokyo: Geotechnical Society, 1997. (in Japanese))