超大型地下洞室拱圈围岩变形、破坏特性研究

刘健, 朱赵辉, 蔡浩, 上官瑾, 李秀文

刘健, 朱赵辉, 蔡浩, 上官瑾, 李秀文. 超大型地下洞室拱圈围岩变形、破坏特性研究[J]. 岩土工程学报, 2018, 40(7): 1257-1267. DOI: 10.11779/CJGE201807012
引用本文: 刘健, 朱赵辉, 蔡浩, 上官瑾, 李秀文. 超大型地下洞室拱圈围岩变形、破坏特性研究[J]. 岩土工程学报, 2018, 40(7): 1257-1267. DOI: 10.11779/CJGE201807012
LIU Jian, ZHU Zhao-hui, CAI Hao, SHANGGUAN Jin, LI Xiu-wen. Deformation and failure characteristics of top arch surrounding rock of super large underground caverns[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(7): 1257-1267. DOI: 10.11779/CJGE201807012
Citation: LIU Jian, ZHU Zhao-hui, CAI Hao, SHANGGUAN Jin, LI Xiu-wen. Deformation and failure characteristics of top arch surrounding rock of super large underground caverns[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(7): 1257-1267. DOI: 10.11779/CJGE201807012

超大型地下洞室拱圈围岩变形、破坏特性研究  English Version

基金项目: 国家重点基础研究发展计划(“973”计划)项目(2013CB035900)
详细信息
    作者简介:

    刘 健(1993- ),男,硕士研究生,主要从事地下洞室围岩安全监测方面的研究。E-mail: liujian_iwhr@126.com。

  • 中图分类号: TU457

Deformation and failure characteristics of top arch surrounding rock of super large underground caverns

  • 摘要: 白鹤滩左岸地下厂房南端墙至#3机组洞段受层内错动带发育影响,拱圈围岩破坏现象突出。结合地质、物探、监测、施工资料对拱圈围岩的变形破坏模式、空间分布特征、演化机制进行分析,结果表明:变形“负增长”表征了洞周环向剪切变形的破坏模式,围岩“弯曲折断”、“鼓出塌落”破坏现象主要发生于剪切变形加速阶段;“台阶状”锚杆应力变化与相应部位“应力控制型”围岩变形步调一致,且沿孔深逐渐衰减。“一拉一压”型锚杆应力主要受结构面的局部控制作用,“荷载陡降”型锚杆应力变化伴随锚固系统介质界面间的非协调变形出现。研究成果可为工程后续加固设计提供重要支撑。
    Abstract: Due to the effect of the internal staggered zones at the left bank of Baihetan Hydropower Station, the destruction phenomenon of the surrounding rock at the top arch between the southern wall and the units No. 3 is obvious. The deformation evolution mechanisms, spatial distribution patterns and failure modes of the surrounding rock are analyzed based on the geological conditions, geophysical prospecting, monitoring data and constrution documents. The results show that the circumferential shear deformation and failure mode of tunnel is characterized by the “negative growth” of displacement, and the “bending breakage” as well as “drum collapse” failure phenomenon occurs mainly in the acceleration phase of shear deformation. According to the stress-time curves, the variations of “step type” stress of bolts keep in step with the “stress-controling type” deformation of the surrounding rock at the corresponding position, and gradually decay with the increase of the depth. The variations of stress of “tension-compression” type bolts are mainly affected by the local control of structural planes. The variations of stress of “stress steep drop” type bolts are associated with the incompatible deformation of anchorage system. This study may provide important supports for future reinforcement designs.
  • [1] HAO Y H,AZZAM R.The plastic zones and displacements around underground openings in rock masses containing a fault[J]. Tunnelling Underground Space Technol, 2005, 20: 49-61.
    [2] 袁培进, 孙建会, 刘志珍, 等. 向家坝水电站地下主厂房围岩稳定监测分析[J]. 岩石力学与工程学报, 2010, 29(6): 1140-1148.
    (YUAN Pei-jin, SUN Jian-hui, LIU Zhi-zhen, et al.Monitoring analysis for rock stability of underground main power house in Xiangjiaba Hydropower Station[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(6): 1140-1148. (in Chinese))
    [3] 李树忱, 马腾飞, 蒋宇静, 等. 深部多裂隙岩体开挖变形破坏规律模型试验研究[J]. 岩土工程学报, 2016, 38(6): 987-995.
    (LI Shu-chen, MA Teng-fei, JIANG Yu-jing, et al.Model tests on deformation and failure laws in excavation of deep rock mass with multiple fracture sets[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(6): 987-995. (in Chinese))
    [4] 黄润秋, 黄达, 段绍辉, 等. 锦屏I级水电站地下厂房施工期围岩变形开裂特征及地质力学机制研究[J]. 岩石力学与工程学报, 2011, 30(1): 23-35.
    (HUANG Run-qiu, HUANG Da, DUAN Shao-hui, et al.Geomechanics mechanism and characteristics of surrounding rock mass defromation failure in construction phase for underground powerhouse of Jinping I Hydropower Station[J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(1): 23-35. (in Chinese))
    [5] HIBINO S, MOTOJIMA M.Rockmass behavior during large-scale cavern excavation[C]// HUDSON J A, ed. Comprehensive Rock Engineering. London:Pergamon Press, 1993: 631-651.
    [6] 中国水电顾问集团华东勘测设计研究院. 金沙江白鹤滩水电站地下厂房顶拱开挖支护总结及后续边墙开挖支护措施汇报材料[R]. 杭州: 中国水电顾问集团华东勘测设计研究院, 2015.
    (East China Investigation and Design Institute, China Hydropower Engineering Consulting Group Co. The underground powerhouse of Jinsha River Baihetan Hydropower Station Arch excavation supporting up and subsequent side wall excavation and supporting measures[R]. Hangzhou:East China Investigation and Design Institute, China Hydropower Engineering Consulting Group Co., 2015. (in Chinese))
    [7] 中国水电顾问集团华东勘测设计研究院. 金沙江白鹤滩水电站左岸引水发电系统土建及金属结构安装工程施工招标文件参考资料:工程地质[R]. 杭州: 中国水电顾问集团华东勘测设计研究院, 2013.
    (East China Investigation and Design Institute, China Hydropower Engineering Consulting Group Co. Bidding documents reference of civil engineering and installation of metal structures of the left bank water diversion and power generation system in Baihetan hydropower station[R]. Hangzhou: East China Investigation and Design Institute, China Hydropower Engineering Consulting Group Co., 2013. (in Chinese))
    [8] 刘国峰, 冯夏庭, 江权, 等. 白鹤滩大型地下厂房开挖围岩片帮破坏特征、规律及机制研究[J]. 岩石力学与工程学报, 2016, 35(5): 865-878.
    (LIU Guo-feng, FENG Xia-ting, JIANG Quan, et al.Failure characteristics, laws and mechanisms of rock spalling in excavation of large-scale underground powerhouse caverns in Baihetan[J]. Chinese Journal of Rock Mechanics and Engineering, 2016, 35(5): 865-878. (in Chinese))
    [9] 基康仪器(北京)有限公司. BGK-A3多点位移计安装使用手册[EB]. 北京: 基康仪器(北京)有限公司, 2014.
    (China Geokon Instruments Co., Ltd The BGK-A3 multi-point displacement meter installation manual[EB]. Beijing: China Geokon Instruments Co, Ltd, 2014. (in Chinese))
    [10] 基康仪器(北京)有限公司. BGK-4910/11/12振弦式钢筋计安装使用手册[EB]. 北京: 基康仪器(北京)有限公司, 2014.
    (China Geokon Instruments Co., Ltd The BGK - 4910/11/12 vibrating string type steel bar meter installation manual[EB]. Beijing: China Geokon Instruments Co, Ltd, 2014. (in Chinese))
    [11] 张伟, 刘泉声. 基于剪切试验的预应力锚杆变形性能分析[J]. 岩土力学, 2014, 35(8): 2231-2240.
    (ZHANG Wei, LIU Quan-sheng.Analysis of deformation characteristics of prestressed anchor bolt based on shear test[J]. Rock and Soil Mechanics, 2014, 35(8): 2231-2240. (in Chinese))
    [12] 张伟, 刘泉声. 节理岩体锚杆的综合变形分析[J]. 岩土力学, 2012, 33(4): 1067-1074.
    (ZHANG Wei, LIU Quan-sheng.Synthetical deformationanalysis of anchor bolt in jointed rock mass[J]. Rock andSoil Mechanics, 2012, 33(4): 1067-1074. (in Chinese))
    [13] 陈仲先, 汤雷. 高地应力大型地下洞室的位移和锚杆应力特性[J]. 岩土工程学报, 2000, 22(3): 294-298.
    (CHEN Zhong-xian, TANG Lei.Rock displacement and load of bolts around large-scale cavities with high stresss[J]. Chinese Journal of Geotechnical Engineering, 2000, 22(3): 294-298. (in Chinese))
    [14] FREEMAN T J.The behaviour of fully-bonded rock bolts in the KieIder experimental tunnel[J]. Tunnels and Tunneling June, 1978, 10(5): 37-40.
  • 期刊类型引用(9)

    1. 苏都都,范勇,吴进高,杨广栋,冷振东. 穿越断层破碎带深埋洞室爆破开挖围岩破坏机理研究进展. 三峡大学学报(自然科学版). 2024(04): 25-34 . 百度学术
    2. 张石磊,朱赵辉,段杭,田振华. 高应力地下洞室顶拱深部变形及受力特性研究. 地下空间与工程学报. 2022(01): 341-350 . 百度学术
    3. 张石磊,田振华. 基于滑动测微计的高地应力洞室围岩变形研究. 岩土工程技术. 2022(06): 437-442 . 百度学术
    4. 王波,黄子康,王兰普,马雨峰,孔张宇,吕风英. 丰宁抽水蓄能电站地下厂房施工期洞室群围岩变形机理研究. 华北科技学院学报. 2022(05): 42-54 . 百度学术
    5. 侯奇东,张顺利,李治国,罗乾坤. 高地应力下大型地下洞室开挖期硬岩片帮机理分析. 水电站设计. 2021(02): 31-35+53 . 百度学术
    6. 何一纯,王兰普,侯奇东,张顺利,孔张宇. 大型地下厂房含蚀变带围岩变形特征与机理分析. 水资源与水工程学报. 2021(04): 206-213 . 百度学术
    7. 周志芳,李思佳,王哲,郭巧娜,石安池,陈朦,沈琪. 白鹤滩水电站错动带非线性渗透参数的原位试验确定. 岩土工程学报. 2020(03): 430-437 . 本站查看
    8. 孟国涛,何世海,陈建林,吴家耀,陈平志,段兴平. 白鹤滩右岸地下厂房顶拱深层变形机理分析. 岩土工程学报. 2020(03): 576-583 . 本站查看
    9. 刘健,朱赵辉,吴浩,张石磊,王晋明. 超大型地下洞室高边墙围岩变形影响特性研究. 岩土力学. 2019(10): 4030-4040 . 百度学术

    其他类型引用(11)

计量
  • 文章访问数:  297
  • HTML全文浏览量:  9
  • PDF下载量:  223
  • 被引次数: 20
出版历程
  • 收稿日期:  2017-05-09
  • 发布日期:  2018-07-24