• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊

禾二矿浅埋破碎顶板切顶成巷试验研究

何满潮, 郭鹏飞, 王炯, 王浩

何满潮, 郭鹏飞, 王炯, 王浩. 禾二矿浅埋破碎顶板切顶成巷试验研究[J]. 岩土工程学报, 2018, 40(3): 391-398. DOI: 10.11779/CJGE201803001
引用本文: 何满潮, 郭鹏飞, 王炯, 王浩. 禾二矿浅埋破碎顶板切顶成巷试验研究[J]. 岩土工程学报, 2018, 40(3): 391-398. DOI: 10.11779/CJGE201803001
HE Man-chao, GUO Peng-fei, WANG Jiong, WANG Hao. Experimental study on gob-side entry formed by roof cut of broken roof at shallow depth of Hecaogou No. 2 Coalmine[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(3): 391-398. DOI: 10.11779/CJGE201803001
Citation: HE Man-chao, GUO Peng-fei, WANG Jiong, WANG Hao. Experimental study on gob-side entry formed by roof cut of broken roof at shallow depth of Hecaogou No. 2 Coalmine[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(3): 391-398. DOI: 10.11779/CJGE201803001

禾二矿浅埋破碎顶板切顶成巷试验研究  English Version

详细信息
    作者简介:

    何满潮(1956-),男,博士,中国科学院院士,教授,博士生导师,主要从事深部岩体力学与工程灾害控制方面的教学与研究工作。E-mail:hemanchao@263.net。

Experimental study on gob-side entry formed by roof cut of broken roof at shallow depth of Hecaogou No. 2 Coalmine

  • 摘要: 针对浅埋薄煤层沿空留巷在工作面回采后垮落带内顶板不易垮落、沿空巷道动压显现剧烈的关键问题,通过关键理论分析、数值模拟、现场工程地质条件分析等手段,对浅埋深、薄煤层、破碎顶板条件下的切顶成巷技术开展研究,并在该条件下的禾草沟二号煤矿1105工作面回风顺槽进行现场应用。通过数值模拟,对比分析了切顶不充分和切顶充分时沿空巷道围岩应力分布及巷道围岩位移,结果表明:切顶充分时,采空区顶板对沿空巷道顶板动压影响大大减弱,巷道围岩变形较小,能够保证留巷效果。根据禾草沟二号煤矿浅埋、破碎顶板开采顶板运动模式和矿压显现特征,确定了切缝角度和恒阻锚索支护等关键参数,为浅埋、破碎顶板切顶卸压自动成巷的成功应用奠定基础,提出了切顶卸压自动成巷的预裂爆破参数设计、自动成巷支护技术;通过对禾草沟二号煤矿1105工作面回风顺槽留巷的工程地质条件分析,运用切顶成巷技术原理进行了留巷设计,并应用到现场,取得较好的应用效果。
    Abstract: For the key problem that the broken roof in caving zone of gob is not easy to fall and dynamic pressure of the gob-side entry is violent for the shallow depth and thin coal layer under broken roof, the technology of automatic gob-side entry formed by roof cut of shallow buried depth, thin coal layer, and broken roof is investigated through theoretical analysis, numerical simulation and engineering geological analysis. Through the numerical simulation, the distribution of stresses and the displacements of the surrounding rock are analyzed and compared when the roof cut is deficient or enough. The result shows that when the roof cut is enough, the effect of the roof of the goaf on the dynamic pressure of roadway roof is greatly weakened, and the deformation of the surrounding rock is small, which can guarantee the effects of the gob-side entry. And it is applied in the air-return way of 1105 working face of Hecaogou No.2 Coalmine. According to its motion patterns and behavioral characteristics of mine pressure, key parameters angle of seam and such as support of constant resistance cable are determined, and it lays a foundation for the successful application of the proposed technology of automatic gob-side entry formed by roof cut of shallow buried and broken roof. The relevant design pre-splitting blasting parameters and pressure relief are put forward. Through the analysis of engineering geological conditions of air return way of 1105 working face of Hecaogou No.2 Coal Mine, the key parameters are designed according to the technical principles of the gob-side entry formed by roof cut. The proposed technology is applied in practice, and good results are achieved.
  • [1] 钱鸣高, 石平五, 许家林. 矿山压力与岩层控制[M]. 徐州:中国矿业大学出版社, 2010: 65-99.
    (QIAN Ming-gao, SHI Ping-wu, XU Jia-lin.Ground pressure and strata control[M]. Xuzhou: China University of Mining and Technology Press, 2010: 65-99. (in Chinese))
    [2] 宋振骐. 实用矿山压力[M]. 徐州: 中国矿业大学出版社, 1988: 41-78.
    (SONG Zhen-qi.Practical ground pressure[M]. Xuzhou: China University of Mining and Technology Press, 1988: 41-78. (in Chinese))
    [3] 何满潮. 深部软岩工程的研究进展与挑战[J]. 煤炭学报, 2014, 39(8): 1409-1417.
    (HE Man-chao.Progress and challenges of soft rock engineering in depth[J]. International Journal of Coal Science & Technology, 2014, 39(8): 1409-1417. (in Chinese))
    [4] 张东升, 茅献彪, 马文顶. 综放沿空留巷围岩变形特征的试验研究[J]. 岩石力学与工程学报, 2002, 21(3): 331-334.
    (ZHANG Dong-sheng, MAO Xian-biao, MA Wen-ding.Experimental study on surrounding rock deformation characteristics of gob-side entry retaining in fully-mechanized caving face[J]. International Journal of Coal Science & Technology, 2002, 21(3): 331-334. (in Chinese))
    [5] 康红普, 牛多龙, 张镇, 等. 深部沿空留巷围岩变形特征与支护技术[J]. 岩石力学与工程学报, 2010, 29(10): 1977-1986.
    (KANG Hong-pu, NIU Duo-long, ZHANG Zhen, et al.Deformation characteristics of surrounding rock and supporting technology of gob-side entry retaining in deep coal mine[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(10): 1977-1986. (in Chinese))
    [6] 何满潮, 曹伍富, 单仁亮, 等. 双向聚能拉伸爆破新技术[J].岩石力学与工程学报, 2003, 22(12): 2047-2051.
    (HE Man-chao, CAO Wu-fu, SHAN Ren-liang, et al.New blasting technology-bilateral cumulative tensile explosion[J]. Chinese Journal of Rock Mechanics and Engineering, 2003, 22(12): 2047-2051. (in Chinese))
    [7] 马立强, 张东升, 王红胜, 等. 厚煤层巷内预置充填带无煤柱开采技术[J]. 岩石力学与工程学报, 2010, 29(4): 675-679.
    (MA Li-qiang, ZHANG Dong-sheng, WANG Hong-sheng, et al.Mining technology with preset packing body in roadway for thick coal seam without coal pillars[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(4): 675-679. (in Chinese))
    [8] 柏建彪, 周华强, 侯朝炯, 等. 沿空留巷巷旁支护技术的发展[J]. 中国矿业大学学报, 2004, 33(2): 183-186.
    (BAI Jian-biao, ZHOU Hua-qiang, HOU Chao-jiong, et al.Development of support technology beside roadway in goaf-side entry retaining for next sublevel[J]. Journal of China University of Mining and Technology, 2004, 33(2): 183-186. (in Chinese)))
    [9] 华心祝, 马俊枫, 许庭教. 锚杆支护巷道巷旁锚索加强支护沿空留巷围岩控制机理研究及应用[J]. 岩石力学与工程学报, 2005, 24(12): 2107-2112.
    (HUA Xin-zhu, MA Jun-feng, XU Ting-jiao.Study on controlling mechanism of surrounding rocks of gob-side entry with combination of roadside reinforced cable supporting and roadway bolt supporting and its application[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(12): 2107-2112. (in Chinese))
    [10] 史红, 姜福兴. 综放采场上覆岩厚层坚硬岩层破断规律的分析及应用[J]. 岩土工程学报, 2006, 28(4): 525-528.
    (SHI Hong, JIANG Fu-xing.Analysis on rupture of hard and massive overlying strata in fully-mechnized sublevel caving face[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(4): 525-528. (in Chinese))
    [11] 谭云亮, 蒋金泉. 采场坚硬顶板断裂步距的板极限分析[J]. 山东矿业学院学报, 1989, 8(3): 21-26.
    (TAN Yun-liang, JIANG Jin-quan.The plate limit analysis of the fracture length of hard roof back of the coalface[J]. Journal of Shandong Mining Institute, 1989, 8(3): 21-26. (in Chinese))
    [12] 黄艳利, 张吉雄, 巨峰. 巷旁充填沿空留巷技术及矿压显现规律[J]. 西安科技大学学报, 2009, 29(5): 515-520.
    (HUANG Yan-li, ZHANG Ji-xiong, JU Feng.Technology of roadside packing in gob-side entry retaining and law of rock pressure[J]. Journal of Xi°an University of Science and Technology, 2009, 29(5): 515-520. (in Chinese))
    [13] 郭志飚, 王将, 曹天培, 等. 薄煤层切顶卸压自动成巷关键参数研究[J]. 中国矿业大学学报, 2016, 29(5): 515-520.
    (GUO Zhi-biao, WANG Jiang, CAO Tian-pei, et al.Research on key parameters of gob-side entry retaining automatically formed by roof cutting and pressure release in thin coal seam mining[J]. Journal of China University of Mining and Technology, 2016, 45(5): 879-885. (in Chinese))
计量
  • 文章访问数:  349
  • HTML全文浏览量:  5
  • PDF下载量:  382
  • 被引次数: 0
出版历程
  • 收稿日期:  2017-03-07
  • 发布日期:  2018-03-24

目录

    /

    返回文章
    返回