砂卵石地层高水压条件下盾构掘进喷涌控制研究

贺少辉, 张淑朝, 李承辉, 朱自鹏, 刘夏冰, 汪大海, 刘仰鹏

贺少辉, 张淑朝, 李承辉, 朱自鹏, 刘夏冰, 汪大海, 刘仰鹏. 砂卵石地层高水压条件下盾构掘进喷涌控制研究[J]. 岩土工程学报, 2017, 39(9): 1583-1590. DOI: 10.11779/CJGE201709005
引用本文: 贺少辉, 张淑朝, 李承辉, 朱自鹏, 刘夏冰, 汪大海, 刘仰鹏. 砂卵石地层高水压条件下盾构掘进喷涌控制研究[J]. 岩土工程学报, 2017, 39(9): 1583-1590. DOI: 10.11779/CJGE201709005
HE Shao-hui, ZHANG Shu-chao, LI Cheng-hui, ZHU Zi-peng, LIU Xia-bing, WANG Da-hai, LIU Yang-peng. Blowout control during EPB shield tunnelling in sandy pebble stratum with high groundwater pressure[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(9): 1583-1590. DOI: 10.11779/CJGE201709005
Citation: HE Shao-hui, ZHANG Shu-chao, LI Cheng-hui, ZHU Zi-peng, LIU Xia-bing, WANG Da-hai, LIU Yang-peng. Blowout control during EPB shield tunnelling in sandy pebble stratum with high groundwater pressure[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(9): 1583-1590. DOI: 10.11779/CJGE201709005

砂卵石地层高水压条件下盾构掘进喷涌控制研究  English Version

基金项目: 兰州市轨道交通砂卵石地层盾构施工地表沉降控制技术研究(C14L01060)
详细信息
    作者简介:

    贺少辉(1966- ),男,教授,博士生导师,主要从事隧道与地下工程专业领域的教学与研究工作。E-mail: heshaohui1114@163.com。

  • 中图分类号: U455.43

Blowout control during EPB shield tunnelling in sandy pebble stratum with high groundwater pressure

  • 摘要: 以兰州地铁1号线一期工程世纪大道站—中间风井区段为背景,综合运用现场调查与过程监测、实验室模拟试验、三维数值模拟等方法与手段,对砂卵石地层高水压条件下土压平衡盾构掘进基于渣土改良的喷涌控制的可靠性进行了研究。主要取得以下成果:①建立了砂卵石地层高水压条件下盾构掘进改良渣土抗渗性(喷涌控制)的定量试验模拟与测试方法;②确定了单掺钠基膨润土浆液改良渣土的膨润土浆液最优浓度和掺加膨润土浆液的最优体积比,并证明了其改良后的渣土的抗渗性能具有较高的喷涌控制可靠性;③同时掺加钠基膨润土浆液和泡沫改良渣土,泡沫的掺入体积比应小于1∶5。研究结果有力地支撑了世纪大道站—中间风井区段高水压条件下,盾构以-28‰的超大纵坡下坡掘进过程的喷涌控制,规避了盾构设备受淹风险。
    Abstract: Based on the earth pressure balance shield tunnelling of Shijidadao station to the ventilation shaft section of Lanzhou metro line 1, the blowout control of conditioned muck in sandy pebble stratum with high groundwater pressure is studied through field investigation, laboratory tests and three-dimensional numerical modelling. It is mainly concluded that: (1) A method is established for testing the anti-blowout of conditioned muck in laboratory; (2) The optimum concentration of sodium-based bentonite slurry and the optimum volume ratio of slurry to soil of the conditioned muck are determined, and the reliability of the anti-blowout of the conditioned muck is verified; (3) The volume ratio of foam to soil of the conditioned muck should be less than 1∶5 when using slurry and foam. The results of this study may guide shield tunneling at the section with the maximum longitudinal grade of -28‰ so as to effectively avoid shield-flooding risks due to blowout.
  • [1] 乐贵平, 贺少辉, 罗富荣. 北京地铁盾构隧道技术[M]. 北京: 人民交通出版社, 2012. (LE Gui-ping, HE Shao-hui, LUO Fu-rong. Beijing subway shield tunneling technology[M]. Beijing: China Communications Press, 2012. (in Chinese))
    [2] 郭彩霞, 孔 恒, 王梦恕. 无水大粒径漂卵砾石地层土压平衡盾构施工渣土改良分析[J]. 土木工程学报, 2015(增刊1): 201-205. (GUO Cai-xia, KONG Heng, WANG Meng-shu. Study on muck improvement of EPB shield tunneling in waterless sandy-cobble-boulder stratum[J]. China Civil Engineering Journal, 2015(S1): 201-205. (in Chinese))
    [3] 汪国锋. 北京砂卵石地层土压平衡盾构土体改良技术试验研究[D]. 北京: 中国地质大学, 2011. (WANG Guo-feng. Test research on soil improvement technology for EPBS in Beijing sandy gravel ground[D]. Beijing: China University of Geosciences, 2011. (in Chinese))
    [4] 何 川, 晏启祥. 加泥式土压平衡盾构机在成都砂卵石地层中应用的几个关键性问题[J]. 隧道建设, 2007, 27(6): 4-6. (HE Chuan, YAN Qi-xiang. Key issues of applying mudding-type EPB shields to sandy cobble ground in Chengdu, China[J]. Tunnel Construction, 2007, 27(6): 4-6. (in Chinese))
    [5] 王国义. 成都富水砂卵石地层盾构设备配置探讨[J]. 现代隧道技术, 2013, 50(1): 34-39. (WANG Guo-yi. Discussion of the modification plan of the EPB TBM applied in a water-rich cobblestone stratum in Chengdu[J]. Modern Tunnelling Technology, 2013, 50(1): 34-39. (in Chinese))
    [6] 晏启祥, 郑代靖, 何 川, 等. 富水砂卵石地层地铁盾构施工若干问题及对策[J]. 地下空间与工程学报, 2015, 11(3): 713-719. (YAN Qi-xiang, ZHENG Dai-jing, HE Chuan, et al. Problems and countermeasures of metro shield construction in water-soaked sand and cobble stratum[J]. Chinese Journal of Underground Space and Engineering, 2015, 11(3): 713-719. (in Chinese))
    [7] 马连丛. 富水砂卵石地层盾构施工渣土改良研究[J]. 隧道建设, 2010, 30(4): 57-63. (MA Lian-cong. Study on ground conditioning for EPB shield in water-rich cobble ground[J]. Tunnel Construction, 2010, 30(4): 57-63. (in Chinese))
    [8] 朱 伟, 秦建设, 魏康林. 土压平衡盾构喷涌发生机理研究[J]. 岩土工程学报, 2004, 26(5): 589-593. (ZHU Wei, QIN Jian-she, WEI Kang-lin. Research on the mechanism of the spewing in the EPB shield tunneling[J]. Chinese Journal of Geotechnical Engineering, 2004, 26(5): 589-593. (in Chinese))
    [9] 魏康林. 土压平衡式盾构施工中喷涌问题的发生机理及其防治措施研究[D]. 南京: 河海大学, 2003. (WEI Kang-lin. Research on blowout mechanism and blowout control in EPB shield tunneling[D]. Nanjing: Hohai University, 2003. (in Chinese))
    [10] 王建刚, 韦 丹, 续长明, 等. 螺旋输送机防喷涌设计介绍及喷涌故障应对措施[J]. 科技与企业, 2014(1): 282. (WANG Jian-gang, WEI Dan, XU Chang-ming, et al. An introduction to blowout control design of screw conveyor and countermeasures against blowout[J]. Technology and Enterprise, 2014(1): 282. (in Chinese))
    [11] 刘德智, 雷金山, 杨秀竹. 土压平衡式盾构双级螺旋输送机对喷涌的控制技术[C]// 2010城市轨道交通关键技术论坛论文集. 北京, 2010. (LIU De-zhi, LEI Jin-shan, YANG Xiu-zhu. Control of water and sand gush by two-stage helical conveyer in tunnelling[C]// 2010 Key Technologies of Urban Rail Transit. Beijing, 2010. (in Chinese))
    [12] BUDACH Christoph, THEWES Markus. Application ranges of EPB shields in coarse ground based on laboratory research[J]. Tunnelling and Underground Space Technology, 2015, 50(8): 296-304.
    [13] KUPFERROTH F J Ellenberger. The use of foams and polymers in earth pressure balanced TBMs[C]. Switzerland: Degussa Construction Chemicals Underground Construction Group, 2001.
    [14] 茅 华. 隧道施工盾构螺旋机喷涌应对措施[J]. 铁道建筑, 2014(10): 39-41. (MAO Hua. Countermeasures to stop muck-gushing from shield’s screw conveyer during tunnel construction[J]. Railway Engineering, 2014(10): 39-41. (in Chinese))
    [15] 罗 欣. 浅谈土压平衡盾构机在隧道掘进中喷涌的治理[J]. 城市建设, 2010(20): 256-257. (LUO Xin. An elementary discussion of governing of blowout in EPB shield tunneling[J]. Urban Construction, 2010(20): 256-257. (in Chinese))
    [16] 王星钧, 徐长胜. 南宁富水圆砾地层防喷涌施工技术[J]. 建筑机械化, 2014(2): 88-89. (WANG Xing-jun, XU Chang-sheng. Nanning anti spewing water round gravel stratum construction technology[J]. Construction Technique, 2014(2): 88-89. (in Chinese))
  • 期刊类型引用(12)

    1. 胡红敏,孔得宽,王荣斗. 基于修正Peck模型的顶管施工软土地层地表沉降规律研究. 河北工业科技. 2025(01): 52-61 . 百度学术
    2. 张浩南,谢建斌,杨海涛,李克努,唐未旭,张艳. 主顶千斤顶启用形式对顶管施工轴向受力的影响研究. 水利规划与设计. 2025(03): 139-144 . 百度学术
    3. 石伟新. 基于顶管施工工艺的城市给排水工程设计. 工程建设与设计. 2025(03): 245-247 . 百度学术
    4. 洪海华. 淡坑水库输水涵洞顶管施工工艺设计及控制技术分析. 水利科技与经济. 2025(03): 151-156 . 百度学术
    5. 胡祥星,雷庆关,邓文杰. 并行顶管施工对管土接触压力影响数值模拟分析. 徐州工程学院学报(自然科学版). 2025(01): 16-22 . 百度学术
    6. 姚言,王奎华,应宏伟,朱成伟,张昌桔,李冰河. 考虑上浮效应的顶管施工引起下方盾构隧道响应简化分析方法. 地基处理. 2024(02): 116-124 . 百度学术
    7. 陈彬皓. 市政道路给排水管道长距离顶管施工技术研究. 中国建筑金属结构. 2024(04): 133-135 . 百度学术
    8. 万海峰,沈青松. 浅埋矩形顶管整体背土效应理论计算与分析. 市政技术. 2024(09): 129-134 . 百度学术
    9. 赵兵. 软弱地层顶管法施工扰动分析及变形控制方法. 水利与建筑工程学报. 2024(04): 66-71 . 百度学术
    10. 朱希熙. 给排水工程中长距离顶管施工技术研究. 海峡科学. 2024(08): 101-103+160 . 百度学术
    11. 张纬韬,曹广勇,葛安星,胡聪. 平行矩形顶管施工对地表沉降的影响分析. 四川轻化工大学学报(自然科学版). 2024(06): 91-97 . 百度学术
    12. 梁志坚,杨瀛. 分仓注浆减阻方式在长距离顶管中的应用. 建筑施工. 2023(01): 121-124+129 . 百度学术

    其他类型引用(2)