绿地中心既有光缆下基坑连通道施工技术

楼楠, 刘俊岩, 曹汉卿, 崔维久

楼楠, 刘俊岩, 曹汉卿, 崔维久. 绿地中心既有光缆下基坑连通道施工技术[J]. 岩土工程学报, 2014, 36(zk2): 212-215. DOI: 10.11779/CJGE2014S2035
引用本文: 楼楠, 刘俊岩, 曹汉卿, 崔维久. 绿地中心既有光缆下基坑连通道施工技术[J]. 岩土工程学报, 2014, 36(zk2): 212-215. DOI: 10.11779/CJGE2014S2035
LOU Nan, LIU Jun-yan, CAO Han-qing, CUI Wei-jiu. Construction technology for connecting passage of foundation pit under existing optical fiber cables of Greeland Center[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 212-215. DOI: 10.11779/CJGE2014S2035
Citation: LOU Nan, LIU Jun-yan, CAO Han-qing, CUI Wei-jiu. Construction technology for connecting passage of foundation pit under existing optical fiber cables of Greeland Center[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 212-215. DOI: 10.11779/CJGE2014S2035

绿地中心既有光缆下基坑连通道施工技术  English Version

详细信息
    作者简介:

    楼 楠(1977- ),男,学士,高级工程师,主要从事土木工程施工工作。E-mail: sinbury0415@126.com。

Construction technology for connecting passage of foundation pit under existing optical fiber cables of Greeland Center

  • 摘要: 本工程在既有光缆下施工基坑连通道,施工时要避免光缆产生过大的沉降造成不利影响。通过有限元模拟和专家论证,最终确定采用管幕技术对通道周围土体先行支护,再施工既有光缆下的连通道。经现场监测土体最大沉降为12 mm,符合光缆变形控制标准,确保了既有光缆的正常使用。该工程运用的管幕连通道施工技术可为类似工程提供良好的借鉴。
    Abstract: The connecting passage of the foundation pit is constructed under the existing optical fiber cables of Greeland Center. The excessive settlement caused by optical fiber cables should be avoided during the construction, which may lead to unfavorable effects. Through finite element modeling and expert discussion, the pipe roofing method is finally adopted for supporting the surrounding soils, and then the connecting passage under optical fiber cables is constructed. Through the field monitoring, the largest settlement of soil is 12 mm, which conforms to the deformation control standards of the optical fiber cable, and the normal use of the existing optical fiber cables is ensured. The pipe roofing construction technology used in the project may provide a good reference for similar projects.
  • [1] 钱七虎. 中国城市地下空间开发利用的现状评价与前景展望[C]// 上海市地下空间综合管理学术论文集. (QIAN Qi-hu. Current situation evaluation and prospect forecast for development and utilization of underground space of Chinese city[C]// Academic papers of Shanghai underground space integrated management. (in Chinese))
    [2] 贺长俊, 蒋中庸, 刘昌用. 潜埋暗挖法隧道施工技术的发展[J].市政技术, 2009, 27(3): 274-279. (HE Chang-jun, JIANG Zhong-yong, LIU Chang-yong. Development of tunnel construction technology with sallow buried-tunnel method[J]. Municipal Technology, 2009, 27(3): 274-279. (in Chinese))
    [3] 冯海宁. 顶管施工环境效应影响及对策[D]. 杭州: 浙江大学, 2003. (FENG Hai-ning. Influence and countermeasure for environmental effect of pipe jacking[D]. Hangzhou: Zhejiang University, 2003. (in Chinese))
    [4] GB 50497—2009建筑基坑工程监测技术规范[S]. 2009. (GB 50497—2009 Technical code for monitoring of building foundation pit engineering[S]. 2009. (in Chinese))
  • 期刊类型引用(3)

    1. 周宁希,陈健,田宁,黄珏皓. 考虑颗粒形状的模拟月壤力学特性离散元研究. 华中科技大学学报(自然科学版). 2024(08): 113-120 . 百度学术
    2. 潘鹏志,王兆丰,封雨捷,李雨芯. 深空探测任务中岩土力学若干问题及研究进展. 岩土力学. 2024(11): 3153-3172 . 百度学术
    3. Bo Liu,Peng Sun,Wei Yao,Tao Li,Wei Xu. Research progress on the adaptability of lunar regolith simulant-based composites and lunar base construction methods. International Journal of Mining Science and Technology. 2024(10): 1341-1363 . 必应学术

    其他类型引用(3)

计量
  • 文章访问数:  296
  • HTML全文浏览量:  4
  • PDF下载量:  217
  • 被引次数: 6
出版历程
  • 收稿日期:  2014-07-27
  • 发布日期:  2014-07-27

目录

    /

    返回文章
    返回