[1] |
平安国际金融中心项目基坑支护工程设计[C]// 深圳地质建设工程公司, 2009. (Supporting of Super-deep Foundation Excavation of Ping’an International Financial Center[C]// Shenzhen Geology & Construction Engineering Company. 2009. (in Chinese))
|
[2] |
杨光华. 广东深基坑支护工程的发展及新挑战[J]. 岩石力学与工程学报, 2012, 31(11): 2276-2285. (YANG Guang-hua. Development and new challenge of deep excavation in Guangdong Province[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(11): 2276-2285. (in Chinese))
|
[3] |
杨光华. 深基坑支护结构的实用计算方法及其应用[M]. 北京: 地质出版社, 2004: 63. (YANG Guang-hua. The practical calculation method and its application for the retaining structure of the deep excavation[M]. Beijing: Geological Publishing House, 2004: 63. (in Chinese))
|
[4] |
杨光华. 深基坑开挖中预应力锚杆或预应力支撑支护结构的计算分析[J]. 建筑结构, 1996(4): 9-12. (YANG Guang-hua. The analysis of the retaining structure with prestressed anchor or prestressed brace in deep excavation[J]. Building Structure, 1996(4): 9-12. (in Chinese))
|
[5] |
JGJ120—2012 建筑基坑支护技术规程[S]. 北京: 中国建筑工业出版社, 2012. (JGJ120—2012 Technical specification for retaining and protection of building foundation excavations[S]. Beijing: China Architecture and Building Press, 2011.(in Chinese))
|
[6] |
SJG05—2011 深圳市基坑支护技术规范[S]. 北京: 中国建筑工业出版社, 2011. (SJG05—2011 Technical code for retaining and protection of excavations in Shenzhen City[S]. Beijing:China Architecture and Building Press, 2011. (in Chinese))
|
[7] |
张玉成, 杨光华, 吴舒界, 等. 土钉支护结构变形与稳定性关系探讨[J]. 岩土力学, 2014, 35(1): 238-247. (ZHANG Yu-cheng, YANG Guang-hua, WU Shu-jie, et al. Discussion on relationship between deformation and stability of soil nailing structure[J]. Rock and Soil Mechanics, 2014, 35(1): 238-247. (in Chinese)).
|
[8] |
张玉成, 杨光华, 姚 捷, 等. 基坑开挖卸荷对下方既有地铁隧道影响的数值仿真分析[J]. 岩土工程学报, 2010, 32(增刊1): 109-115. (ZHANG Yu-cheng, YANG Guang-hua, YAO Jie, et al. Numerical simulation and analysis of effect of excavation of foundation pits on metro tunnels[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(S1): 109-115. (in Chinese))
|
[9] |
刘斯琴, 余晓琳, 颜全胜. 基坑开挖对下方既有地铁影响数值分析[J]. 广东土木与建筑, 2009(6): 19-20. (LIU Si-qin, YU Xiao-lin, YAN Quan-sheng. Numerical simulation analysis for influence of overhead excavation on existing MTR[J]. Guangdong Architecture Civil Engineering, 2009(6): 19-20. (in Chinese))
|
[10] |
张玉成, 杨光华, 钟志辉, 等. 软土基坑设计若干关键问题探讨及基坑设计实例应用分析[J]. 岩石力学与工程学报, 2012, 31(11): 2234-2243. (ZHANG Yu-cheng, YANG Guang-hua, ZHONG Zhi-hui, et al. Some critical problems in soft soil pit designand design examples application analysis[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(11): 2334-2343. (in Chinese))
|
[11] |
张玉成, 杨光华, 胡海英, 等. 软土深基坑围堰及基础施工对既有下穿管线的影响及保护措施研究[J].岩土工程学报, 2012, 34(增刊2): 364-370. (HANG Yu-cheng, YANG Guang-hua, HU Hai-ying, et al. Effect of construction of deep excavation cofferdams and foundation in soft soils on underneath pipelines and protective measures[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(S1): 364-370. (in Chinese))
|
[12] |
张玉成, 杨光华, 胡海英, 等. 格栅式连续墙在沉管隧道护岸工程支护中的应用[J]. 岩土工程学报, 2012, 34(增刊2): 440-446. (HANG Yu-cheng, YANG Guang-hua, HU Hai-ying, et al. Application of grillage shaped diaphragm wall supporting the revetment project of the immersed tube tunnel[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(S1): 440-446. (in Chinese))
|
[13] |
李兴高. 既有地铁线路变形控制标准研究[J]. 铁道建筑, 2010(4): 84-88. (LI Xing-gao. Jacking technology and monitoring during tunneling under existing metro structures[J]. Railway Engineering, 2010(4): 84-88. (in Chinese))
|